Laserfiche WebLink
Table 8-1 <br /> Water System Capital Improvements Needed for the Portion of the <br /> SW Everett Subarea Served by the City of Everett <br /> Capital Improvement Cost Responsibility Properties That May Estimated <br /> Needed for Funding Be Required to Fund all or a Timing of <br /> Portion of the Improvement Improvement <br /> Evergreen Way pump $700,000 City 1996 <br /> station expansion <br /> Connection between City's unknown City 2000 <br /> water line and the <br /> Mukilteo Water District; <br /> Reservoir No.4 <br /> 20-inch main on Glenwood $352,000 City and/or Associated Sand and Gravel* 2008 <br /> Avenue Developer <br /> 16-inch parallel main on $396,000 City and/or Lots 1, 2a and 2b of Seaway 2008 <br /> Seaway Boulevard Developer Center, <br /> Intermec <br /> Bhend <br /> Boeing <br /> Fluke* <br /> 16-inch main on Hardeson $299,000 City and/or Merrill Creek Centre After year <br /> Road Developer Merrill Creek Assoc. 2020 <br /> Associated Sand and Gravel* <br /> 8-inch main on Kasch Park $68,000 Developer Puget Sound Industrial At time of <br /> to 100th Street SE or Associates** development <br /> connect into MWDs line at <br /> the NE corner of the <br /> Bomarc property <br /> 16-inch main from Seaway $456,000 Developer Properties west of Japanese At time of <br /> Boulevard and 36th and/or City Gulch(approximately 294 NDA) development <br /> Ave. W across and properties that front on 40th or 2000, <br /> Japanese Gulch to Ave. W * whichever <br /> 40th Ave. W and comes first <br /> south on 40th to 76th <br /> Ave SW <br /> * Participation in funding by specific properties is based upon the assumption that one or more of these <br /> parcels will not have adequate fire flow without the improvement. If the improvement is not needed to <br /> meet fire flow requirements or other site specific development requirements, participation in funding <br /> would not be required. If a smaller improvement is needed to meet fire flow requirements, the City <br /> will share in the cost of constructing the improvement. <br /> ** This improvement is needed to improve water quality by avoiding deadend lines. <br /> 45 <br />