My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4425 29TH AVE SE 2018-05-25
>
Address Records
>
29TH AVE SE
>
4425
>
4425 29TH AVE SE 2018-05-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2018 12:09:22 PM
Creation date
3/14/2018 3:54:59 PM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
4425
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT DFR 035 <br /> u Date: 5/03/2017 <br /> CEO DESIGNZ PHOTO LOG 4 of 7. <br /> t 1111M111.11 <br /> ''&,,.* G� tIf��-#} sti ��f" f Ii ,.it 1 r .,� <br /> . <br /> • <br /> .3k�r'i ,,, ,"a ""'s,�,„t 4 1.a�'• f . <br /> Comments: Lot 225-Over-excavated area-1.5 feet to 3.0 Comments: Lot 224-Over-excavated area in southeast <br /> feet below bottom of footing corner lot area(-3-4 feet of over-excavation) <br /> 111 <br /> ..:. ..<., . ) g ;... ^dim+r t <br /> „fir ,. • <br /> rYf x. ,S�y <br /> i,„./ 1,40 T'1 <br /> '` Jar Sd'F�Sir`LY' �71'�JIaP-^' '}S. <br /> Comments: Lot 224-Over-excavated area(-5 feet in Comments: Lot 226 lot area covered/backfilled with <br /> depth)in southeast corner which could be probed 3 feet railroad ballast material. <br /> This reportpresents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the <br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does <br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety. This F eld report is a <br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the <br /> GeoDesign project manager,as indicated by initials In the"Reviewed By”section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 251203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.