My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4425 29TH AVE SE 2018-05-25
>
Address Records
>
29TH AVE SE
>
4425
>
4425 29TH AVE SE 2018-05-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2018 12:09:22 PM
Creation date
3/14/2018 3:54:59 PM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
4425
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT DFR 035 <br /> CEO DESIGNv Date: 5/0312_017j <br /> ? PHOTO LOG (....5 of <br /> ..,••4 <br /> 7 <br /> ~t � : y <br /> , wf wz <br /> rt ,. air' '+' 'K,�,� 7 'F -'V <br /> '':„1!.-.0;;; 'r r +06,1?lj Nth ' •f ,} C',M ,. �"" ''; <br /> Comments: Lot 236-Lot area which had been backfilled Comments: Lot 236-Lot area which had been backfilled <br /> with railroad ballast material. with railroad ballast material. <br /> 'at4 - . ,` <br /> rf `4 rr t.t <br /> t � . �, '. 1 <br /> .t .n. , rrt 1' R <br /> '• n'e <br /> 1 f 7—;j `r 7t a ,fit �f u <br /> ro-., <br /> t ' <br /> r�rk f h1A'r ^� r <br /> f <br /> 4. • V1,-!,'" "..ro,. -fr...' <br /> • <br /> Comments: Lot 238-South half of lot area which could Comments: Lot 238-North half of lot area <br /> be probed 1 foot <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the <br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does <br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety. This field report is a <br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the <br /> GeoDesign project manager,as Indicated by Initials in the and <br /> By'section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.