My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4419 30TH DR SE 2021-12-15
>
Address Records
>
30TH DR SE
>
4419
>
4419 30TH DR SE 2021-12-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 11:38:20 AM
Creation date
3/15/2018 1:33:00 PM
Metadata
Fields
Template:
Address Document
Street Name
30TH DR SE
Street Number
4419
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />DESIGM `' 4 <br />R <br />Project Name: <br />Everett River Front- Simpson <br />Report: 036 <br />GeoDesign # : <br />Polygon-127-03 <br />Date: 05/04/2017 <br />Reports with Unresolved Nonconformance Issues: <br />Permit <br />PW1505-005 <br />Nick Abdelnour (Polygon) <br />Randy Allen (City of Everett) <br />Weather: Clear, 60's <br />Ron Bowen (Polygon) <br />Eddy Stevens (Polygon) <br />Arrival/Departure: 0915/1615 <br />Distribution: <br />Doug Ross (Polygon) <br />----- --.,-.---- <br />Kirk Keck (City of Everett) <br />— <br />Paul McKee (City of Everett) <br />m Site Plan(s) <br />Dave Foster (City of Everett) <br />w_ <br />m Density Test Summary <br />Prepared By Ben Weinberg <br />Signature: <br />Attachments: <br />Installation Records <br />Other <br />I Reviewed By: <br />SUMMARY of OBSERVATIONS (CONTINUED): <br />Lot 226: <br />Previously, GeoDesign noted that DDS had over -excavated the Lot 225 area down 1.5 to 3 feet down to material which <br />could generally be probed less than 4 inches. Today, relative compaction of the exposed soil was tested using a Troxier <br />Moisture -Density gauge; in -place density tests indicated that the material had been compacted to greater than 96% of its <br />maximum dry density as determined by a Modified Proctor analysis. <br />GeoDesign recommended that the over -excavated area be lined with a non -woven geotextile material and backfilled with <br />structural fill material. GeoDesign noted that DDS began importing 2-inch railroad ballast for use as structural fill for Lot 225 <br />today. <br />Craig with DDS stated that the over -excavated areas would be lined with non -woven geotextile and backfilled with a <br />crushed rock material starting tomorrow. GeoDesign notified the contractor that the over -excavated areas were currently <br />suitable to place backfill material. <br />Lot 238: <br />oDesign noted areas along the west, south, and east sides of Lot 238 which could be probed 6 inches to 1,5 <br />feet using a 1/2 inch diameter soil probe. Today, GeoDesign noted that DDS had over -excavated Lot 238 down to a <br />gray -brown to gray silty SAND with gravel which could generally be probed less than 2 inches. Over -excavation depths <br />ranged from 4 inches to 1.5 feet. Relative compaction of the foundation subgrade was tested using a Troxler <br />Moisture -Density gauge; in -place density tests indicated that the material had been compacted to greater than 95% of its <br />maximum dry density as determined by a Modified Proctor analysis. <br />GeoDesign notified the contractor that the lot area was currently suitable for the placement of backfill material, Craig with <br />DDS stated that the over -excavated areas would be backfilled with a crushed rock or recycled concrete material at a later <br />date. <br />The client and contractor were notified of our observations prior to our departure from the site, <br />A summary of our observations and density tests can be found in the attached Figure 1, Nuclear Density Gauge Data, and <br />Photo Log. <br />This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services, We rely on the contractor to comply with the plans and <br />specifications throughout the duration of the project Irrespective of the presence of our representative. Our work does not Include supervision or direction of the contractor, the contractor's employees <br />or agents, our firm Is not responsible for site safety. This field report is a DRAFT representation of our field observations, testing, and preliminary recommendations, The report can only be considered <br />Anal upon review of the GeoDesign project manager, as Indicated by Initials In the "Reviewed By" section, <br />10700 Meridian Avenue North, Suite 402 1 Seattle, WA 98133 1 206,838.9900 <br />2502 Jefferson Avenue I Tacoma, WA 98402 1 253.203.009S <br />
The URL can be used to link to this page
Your browser does not support the video tag.