My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6201 ASSOCIATED BLVD BASE FILE 2018-03-29
>
Address Records
>
ASSOCIATED BLVD
>
6201
>
BASE FILE
>
6201 ASSOCIATED BLVD BASE FILE 2018-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 1:19:21 PM
Creation date
3/27/2018 10:37:23 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6201
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� U <br /> lam' <br /> 0 <br /> 33 Post-Development Condition <br /> In order to achieve the Pre-Mining basin characteristics the entire 200,0000 square foot building <br /> rooftop area within Phase 1 & 30% within Phase 2 will flow into CEMEX's site and be <br /> incorporated into the zero discharge on-site stormwater management plan. Eventually this area <br /> will be tributary to Pigeon Creek when development of the remainder of the CEMEX property is <br /> complete. <br /> New pollution generating impervious surfacing in the proposed development will be pre-treated <br /> prior to entering the wetpond by a Vortechs pre-treatment vault. Runoff will then enter a water <br /> • quality wetpond prior to connection into the Glenwood regional facility. The water quality <br /> wetpond treating all new pollution generating impervious surfacing will provide up to 85%of the <br /> required storage area in a deep (3-6') treatment cell. The remaining required dead storage will <br /> be contained within a 15%water quality treatment cell with an average cell depth of 2 feet. <br /> The Glenwood regional infiltration / detention facility provides streambank erosion control in <br /> accordance with City of Everett requirements in effect at the time of construction. <br /> 4.0 OFF-SITE ANALYSIS REPORT <br /> This section evaluates the upstream and downstream drainage system. The intent of this section <br /> is to identify any existing or potential drainage impacts created or exacerbated by the proposed <br /> project and drainage facilities. <br /> 4.1 Task 1: Study Area Definition <br /> The offsite analysis study area was identified from a USGS contour map and several site visits <br /> during 2010. <br /> • <br /> 4.2 Task 2:Review of Available Information <br /> • The following resources were utilized in preparation of this section: <br /> AeroMetric Topographic&Existing Feature Map <br /> Snohomish County SnoScape Landscape Imaging Interactive Map <br /> National Resources Conservation Service Web Soil Survey 2.2 <br /> 4.3 Task 3: Field Inspection <br /> Several field inspections were performed in 2010 to verify downstream conditions. Stormwater <br /> discharges from the Glenwood regional facility on the north side of Merrill Creek Parkway and <br /> flows unimpeded beyond 1/4 mile from the site. No sign of significant erosion or backwater <br /> • <br /> effects were noted. <br /> Review of the Snohomish, County Snohomish County Landscape Imaging, SNOSCAPE, <br /> website, indicates Glenwood Creek is categorized as Non Fish habitat. <br /> DAVID EvANs AND ASSOCIATES,INC. <br /> UNDERWOOD GARTLAND EVERETT FEBRUARY 3,2015 <br /> STORMWATER SITE PLAN PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.