My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4201 RUCKER AVE COMMUNITY HEALTH CENTER 2019-04-10
>
Address Records
>
RUCKER AVE
>
4201
>
COMMUNITY HEALTH CENTER
>
4201 RUCKER AVE COMMUNITY HEALTH CENTER 2019-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 9:26:24 AM
Creation date
3/27/2018 12:05:11 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4201
Tenant Name
COMMUNITY HEALTH CENTER
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 AUG 2017 <br /> PUBLIC mORKS PERMIT I ate Applied: 6/13/2017 <br /> City of Everett Public Works Department <br /> PublictlVUrks Permit#: PW1706-012 <br /> 3200 Cedar Street Parent Permit#: B1705-065 <br /> Planning Everett,WA 98201 Reference#: REVII17-013 <br /> (425) 257-8810 Public Works Fee: $85.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> COMMUNITY HEALTH CNTR OF SNOH CO J R ABBOTT CONSTRUCTION INC <br /> 8609 EVERGREEN WAY 3408 1ST AVE S#101 <br /> EVERETT, WA, 98208 SEATTLE, WA, 98134 <br /> PHONE: 4257893700 PHONE: 2064678500 <br /> TAX PARCEL ID#: 00582202200101 SITE ADDRESS: 4201 RUCKER AVE <br /> DESCRIPTION: PATCHWORK PAVING IN PARKING LOT FOR TI <br /> Site work to include demolition of one driveway, partial sidewalk, and some landscaping. New site work to include partial new <br /> sidewalk, some parking re-striping, and relocation of existing generator pad. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated <br /> 7/28/2017. Approved plans must remain on job-site at all times. - r <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting,,,pp j§tructh tole by a <br /> pre-construction consultation. All inspections must be formally requested. See the attached handout ts?.Requa#s an. <br /> Inspection form for phone number and online instructions. C 1--" :re: <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approveF-i <br /> d lanH Ove on <br /> completion of the project prior to final approval of the permit. 0-. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. r,;) r9, 7 <br /> 8. As-builts of any installed utilities will be required to be submitted to the PW Inspector per City Design and Constr, f].4n <br /> Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 9. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Sell the inspection lino <br /> request a Final for this permit when all items have been completed. CO :' <br /> Public Works Permit Fee Breakdown: „r'0 p A'pl <br /> Paving $45.00 .,;F-28 <br /> 8 <br /> PW Plan Review $20.00 "'=;r.-.1 <br /> PW Site Inspection $20.00 p-• <br /> City ofEverett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> ��� �-2& 2Z f7 expenses,or causes of action that may arise because of installation and <br /> ix,. maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replac lic property aged thereby. <br /> FINAL INSPECTION Date ti <br /> Approved as Constructed (PW Inspector) Si atu of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ONrSTHIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.