Laserfiche WebLink
Fl L- <br /> * PUBLIC WORKS <br /> e 21 <br /> MEMORANDUM <br /> TO: Brian Wilson, Architectural Werks, 425-823-2244 <br /> CC: Jeff Vander Pol, Abbott Construction, 206-467-8500 <br /> FROM: Sabrina Fandler, Engineering/Permit Services, 425-257-7813 <br /> DATE: 7/12/2017 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Site paving, striping, landscaping associated with T.I. <br /> LOCATION: 4205 Rucker Ave <br /> PERMIT#: PW1706-012 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following <br /> revisions should be made and/or the following conditions must be met: <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your plans <br /> accordingly, prior to resubmitting to the Permit Services Counter. If you have any questions <br /> regarding the comments/redlines or need anything further, please directly contact this project's <br /> Public Works plans reviewer, Sabrina Fandler, at 425-257-7813 or SFandler@everettwa.gov. <br /> a. Please resubmit the following items to the Permit Services Counter with your <br /> resubmittal once all requested revisions have been made: <br /> i. Transmittal Sheet: (1) available online at https://everettwa.gov/Permits or at the <br /> Permit Counter-2°d Floor, 3200 Cedar Street. <br /> ii. Plans: (2) sets of revised plans plus original City Markups. <br /> iii. Drainage Report: (2) copies of Stormwater Management Questionnaire, <br /> completed if added plus replaced impervious surfaces totals 2000sf or more. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:00pm-4:OOpm(closed between 12:OOpm-1:OOpm for lunch). <br /> 2. Resubmitted plans must include engineer or architect's stamp and must be signed (all sheets) in <br /> order to be valid for permit issuance. <br /> 3. Update cover sheet to include or highlight only the sheets that are provided for the proposed site <br /> upgrades. <br /> 4. Sheet A1.1 references civil plans. No civil plans were submitted. If there are civil plans, these <br /> are the plans that should be submitted for Public Works plan review. If no civils exist, please <br /> remove this reference, as applicable. <br /> Page 1 of 2 <br />