Laserfiche WebLink
Community Health Center of Snohomish County- Everett <br /> Jul 27th, 2017 <br /> 'age 33 <br /> Response: Noted. Please attached find the updated cover sheet indicating only the sheets required <br /> for the Public Works permit(sheet A0.1). <br /> 4. Sheet A1.1 references civil plans. No civil plans were submitted. If there are civil plans, these are <br /> the plans that should be submitted for Public Works plan review. If no civils existing, please <br /> remove this reference, as applicable. <br /> Response: Noted. We do not have any civil drawings for this project. Therefore, the reference from <br /> sheet A1.1 has been removed. <br /> 5. An RPBA is required since the proposed use is considered a high-hazard facility. The RPBA can be <br /> located inside the building. Please add a note to the plans to indicate such as addition. This is <br /> required under a separate Plumbing Permit. <br /> Response: Noted. A note has been added to the plan sheet to install an RPBA within the building <br /> under separate Plumbing Permit. See sheet A1.1. <br /> 6. Please quantify the proposed impervious area that will be added and replaced. If the total of <br /> added plus replaced impervious surface is 2000sf or more, stormwater mitigation evaluation is <br /> triggered in accordance with the City's 2010 Stormwater Management Manual and Interim Policy <br /> 2-11. See the City's Stormwater page for links to this information by visiting <br /> https://everettwa.gov/permits, click on Quick Links on the right-hand side, and navigate to the <br /> Stormwater Management link. <br /> a. Note that impervious area is counted once the base course or subgrade is exposed. Only <br /> minor grinding/overlay through the existing top course is considered maintenance and not <br /> counted. <br /> b. If 2000sf of added or replaced impervious surface, please complete the attached <br /> Stormwater Management Questionnaire. There is a fillable Word document version of this <br /> Questionnaire if you would prefer to complete it electronically rather than by hand. Please <br /> email Sabrina Fandler at SFandler@everett.gov to receive a copy of this document. <br /> c. Show on the plans the existing drainage structures and pipes and any modifications to site <br /> drainage. Show how the proposed sire will drain to the on-site storm drain collection <br /> system and the combined sewer system. Do not connect roof drains directly to the lateral <br /> or side sewer. <br /> d. Please add erosion control measures to the site plan (or separate site plan sheet) in <br /> accordance with the completed 13 elements within the Stormwater Management <br /> Questionnaire (checklist on last two pages). <br /> Response: Noted. Since our project will have just over 2,000 sf of added and/or replaced <br /> impervious area, we have completed the Storm water Management Questionnaire per request. <br /> Please also find the attached drainage plan (8.x 11 format)behind the questionnaire. <br /> 7. Parking layout as currently shown is sufficient and in compliance with City of Everett Standards. <br /> Any changes to parking layout must meet the requirements of Standard Drawing#340. Please visit <br />