My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31 112TH ST SE 2018-03-30
>
Address Records
>
112TH ST SE
>
31
>
31 112TH ST SE 2018-03-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 1:33:02 PM
Creation date
3/29/2018 9:34:25 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
31
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR THE 1 EVELOPER <br /> Planning Depart n cut co i ments: <br /> 1. If a complete application has not been filed for a building permit or equivalent construction <br /> permit within eighteen (18) months from the approval date of this decision, the permit shall be <br /> deemed terminated, unless an extension is granted. If the permittee requestsan extension in <br /> writing not later than eighteen (18) months from the land use permit date, the Director may <br /> grant a six (6)month extension. <br /> 2. A survey may be required at the time of building permit application submittal or at the framing <br /> inspection to show compliance with the height and/or setback requirements. <br /> 3. This is an administrative decision that may be appealed to the City's Land Use Hearing <br /> Examiner. An appeal must be filed with the City within 14 days of the date of this notice. If <br /> you have questions regarding this proposal or if you wish to file an appeal, please contact <br /> Teresa Firnstahl, City of Everett Planning Department, at 425.257.8731. <br /> Public Services/E;i,gincering cum u.r ents: <br /> 1. Construction pennits, inspections and approvals must be obtained for the structure in <br /> accordance with established building department requirements. <br /> 2. This project must comply with the current City of Everett Building Code. <br /> 3. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> 4. Lack of comment on the plans submitted with the application does not constitute approval of <br /> these plans. <br /> REVII #11-018 J� <br />
The URL can be used to link to this page
Your browser does not support the video tag.