Laserfiche WebLink
INSPECTION REPORT 1Pbio <br /> .v✓ ;•.:gam - <br /> Date q Permit: �t 20� —�3 <br /> Contractor: <br /> Owner: <br /> Site Address: "kt-k l% 25\-1,-(0\ CJC� <br /> TYPE O t,S', <br /> ELECTRICAL B ILDING MECHANICAL PLUMBING <br /> ❑Temp Sice +• <br /> ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ooting ❑Rough In ❑Rough In <br /> 0 Slab/Co it Ground rk 1oundation ❑Ceiling Grid ❑Ceiling Grid <br /> a <br /> ❑Rough In ❑ tructI rb OK t insulate ❑OK to insulate <br /> ❑Service ►, Pr Units ❑Water Service <br /> ❑Grounding ''d ■Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> )17PtTt Sp <br /> J- <br /> Inspector: Ki(...- Date: q"J <br /> >� ! <br /> EIR(10/06) D.6TA8AR,INC. <br />