Laserfiche WebLink
{ <br /> GEU ESI,IizFIELD REPORT -- <br /> - 2of5 - � <br /> Project Name: 1 Everett River Front-Simpson I Report: 067 <br /> GeoDesign#: 1 Polygon 127 03 Date: 08/02/2017 <br /> Reports with Unresolved Nonconformance Issues: I Permit: <br /> I PW1505-005 <br /> 3 Nick Abdelnour(Polygon) 1 Randy Allen(City of Everett) ? Weather: Clear, 60-80's . <br /> Ron Bowen(Polygon) I Eddy Stevens(Polygon) i Arrival/Departure: 0930/1645 <br /> Distribution: 1 <br /> s ' Doug Ross(Polygon) 1 Kirk Keck(City of Everett) <br /> 1 <br /> Paul McKee(City of Everett) 1 Dave Foster(City of Everett) Prepared By Ben Weinberg, EIT <br /> Attachments: ° <br /> m Site llan(s) po Density Test Summary Signature: k-..-g' <br /> El Installation Records Other '�-y Reviewed By: <br /> SUMMARY of OBSERVATIONS (CONTINUED): <br /> LOT 210: <br /> Today, GeoDesign noted that DDS had completed excavation of the footing, crawl space, and crawl space drain for Lot <br /> 210. Previously, GeoDesign noted that BDZ had over-excavated the lot area down to firm and unyielding soil (-3 feet) and <br /> backfilled the lot area with an imported gray silty SAND (f-m)with gravel (f-c)which was compacted to greater than 95% of <br /> its maximum dry density as determined by a Modified Proctor analysis. GeoDesign noted that the exposed foundation <br /> subgrade consisted of the previously mentioned gray silty SAND with gravel which could generally be probed less than 1 <br /> inch using a 1/2 inch diameter soil probe. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade material observed today is currently suitable for <br /> support of the intended structure. GeoDesign recommends that any loose and saturated material be removed from the base <br /> of the footings prior to placement of concrete. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />