Laserfiche WebLink
h. Oakes Bridge Replacement Preliminary Engineering. <br /> i . 7th Avenue Warning Device. <br /> j . 41st Street and Rucker/Colby Signal Reconstruction. <br /> k. 12th Street Realignment at Rainier. <br /> 1 . N. Broadway $ Tower Street Signalization. <br /> m. Eastmont Bridge Traffic Signal Interconnect Conduit . <br /> n. Everett Mall Way (SCL to I-5) Traffic Control <br /> Markings. <br /> o. Broadway ( 41st-10th) Markings $ Signal Loops. <br /> p. SR527/116th Intersection Design. <br /> q. CBD (Central Business District) Traffic Signal <br /> Interconnect . <br /> r. 41st Avenue W (SCL-Holly) Geometric Design. <br /> s . 112th Street (19th Ave . S. E. -WCL) Geometric Design. <br /> t . Riverside Traffic Signals Design. <br /> u. 112th St. /I- 5 Ramp Design Study. <br /> v. Traffic Signal Master Implementation. <br /> Section 3 : The total estimated cost of the <br /> additional Traffic Engineering Safety Improvements is $837, 369 <br /> which shall include all cost of the design, plans , <br /> specifications , construction and associated costs . <br /> Section 4 : The City Engineer/City Traffic Engineer <br /> of the City of Everett , under the administration of the Mayor , <br /> is hereby given responsibility of providing for the <br /> construction of the improvements as defined herein. <br /> Section 5 : The City Treasurer of the City of <br /> Everett is authorized to issue construction warrants as funds <br /> are required to a local bank for interim construction financing <br /> at a reasonable rate of interest. <br /> 2 <br />