Laserfiche WebLink
Section 6 : The additional sum of $837, 869 be <br /> appropriated to Fund 368 , Traffic Engineering Improvements , for <br /> the purposes of completing preliminary engineering and <br /> constructing Traffic Engineering Safety Improvements as follows : <br /> a. Program 290, 42nd Street Bridge Warning Device <br /> 1 . Appropriation $20, 000 <br /> 2 . Source of Funds <br /> HHS $11 , 080 <br /> Arterial Gas Tax $ 8 , 920 <br /> b . Program 291 , Lombard Bridge Replacement <br /> Preliminary Engineering <br /> 1 . Appropriation $50, 000 <br /> 2 . Source of Funds <br /> BRM $40, 000 <br /> Local $10 , 000 <br /> c. Program 292 , Everett Avenue Signal Coordination <br /> and Timing Design, and Controller Installation <br /> Specs <br /> 1 . Appropriation $32 , 000 <br /> 2. Source of Funds <br /> TQX (Federal Demo) $16 , 000 <br /> Arterial Gas Tax $16, 000 <br /> d . Program 293, 1986 Interim Traffic Signal <br /> Improvements Including Span Wire Signal <br /> Installations , Detection, Turning Movement <br /> Indication Improvements <br /> 1 . Appropriation $65 , 000 <br /> 2. Source of Funds <br /> Arterial Gas Tax $ 65, 000 <br /> e. Program 294 , Pacific Avenue Rubber Railroad <br /> Crossing Installation <br /> 1 . Appropriation $100 , 000 <br /> 2 . Source of Funds <br /> FAUS $82 , 000 <br /> Arterial Gas Tax $18 , 000 <br /> f. Program 295 , 1986 Pedestrian Path Improvements <br /> 1 . Appropriation $ 75, 000 <br /> 2. Source of Funds <br /> Arterial Gas Tax $75 , 000 <br /> g . Program 297, Hewitt Bridge Replacement <br /> Preliminary Engineering <br /> 1 . Appropriation $100, 000 <br /> 2. Source of Funds <br /> BRM $80, 000 <br /> Local $20, 000 <br /> 3 <br />