My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1179-85
>
Ordinances
>
Ordinance 1179-85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 11:54:26 AM
Creation date
3/30/2018 11:54:21 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1179-85
Date
10/23/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br /> � I <br /> x. The proposed treatment of all public street frontages and , <br /> the continuous landscaped buffer adjacent to I-5, including,: <br /> materials and techniques used, such as screens, fences, <br /> walls or vegetation. <br /> xi. Plans for external signing and lighting. <br /> xii. A conceptual graphic indicating the proposed external , <br /> appearance, use of materials and colors for each of the <br /> proposed structures. <br /> C. Each detailed site plan, and accompanying materials, shall be <br /> submitted to the City of Everett Planning Department for review ; <br /> and approval. The criteria for such review, and the approval, <br /> modification or denial of the detailed site plan, shall be in <br /> conformance with this Agreement, the Comprehensive Plan, and the <br /> conditions of the Zoning report as approved by the Hearing <br /> Examiner. Any party disagreeing with the Planning Department's <br /> administration of the site plan review process may make an appeal <br /> before the City Hearing Examiner. Upon final approval of a <br /> detailed site plan for any phase of development, the same shall <br /> become an integral and binding part of this Zoning Agreement. <br /> Development of each phase shall be in conformance with the <br /> applicable site plan. <br /> 4. ACCESS <br /> A. Access to the subject property shall be from 16th Avenue S.E. and <br /> the east-west public connector street 102nd. Access to 16th <br /> Avenue S.E. and 102nd St. S.E. will be reviewed by the City <br /> Traffic Engineer during the detailed site plan review process to <br /> insure adequate driveway separation. <br /> CONCOMITANT AGREEMENT - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.