Laserfiche WebLink
II B. As each phase is developed, the Owners shall improve streets and <br /> extend utilities in accordance with City ordinances, standards„ <br /> i' and the 19th Avenue S.E. Comprehensive Plan. These requirements '. <br /> shall be applied to the development of 16th Avenue S.E. and 102nd <br /> St. S.E. <br /> C. Right-of-way for 16th Avenue S.E. from 112th Street S.E. to 100th <br /> Street S.E. and the east-west public or private connector <br /> streets, or utility easements, shall be dedicated in a manner <br /> generally consistent with Exhibit B in a location and ', <br /> rights-of-way widths acceptable to the City Public Works` <br /> Department upon one of the following conditions: <br /> i. When the property owner applies for a binding site plan, <br /> plat, short plat or building permit. <br /> ii. Within 30 days from the time an abutting property owner or <br /> the City requests that the right-of-way, or utility <br /> easements (30' ) be dedicated to enable the construction of <br /> 16th Avenue S.E. and the east-west connector streets, or <br /> utility easements as deemed appropriate by the City Traffic <br /> Engineer to provide reasonable access to any property. <br /> IIiii. Within five years from the date of approval of the rezone. <br /> iv. If the applicant elects to pursue the binding site plan <br /> evaluation process, ii and iii above do not apply for that <br /> phase approved by the City. <br /> CONCOMITANT AGREEMENT - 5 <br /> 1 <br />