My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW MTORRES AMERICA 2018-09-18
>
Address Records
>
80TH ST SW
>
905
>
MTORRES AMERICA
>
905 80TH ST SW MTORRES AMERICA 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 8:45:35 AM
Creation date
3/30/2018 2:31:54 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
MTORRES AMERICA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 8: PUBLIC SERVICES AND UTILITIES <br /> 8.1 FIRE <br /> 8.1.3 Mitigation Measures <br /> 1. Water main extensions will be required to serve specific sites. <br /> 8.2 POLICE • <br /> 8.2.3 Mitigation Measures <br /> 1. All developments must provide adequate lighting of parking lots and others areas which <br /> have an increased risk for crime. Illumination should be a minimum of 3-4 foot candles. <br /> (The City of Everett Zoning Code requires that all parking lots with more than 10 spaces <br /> provide security lighting. Lighting must be shielded in a manner that does not disturb <br /> residential uses.) <br /> 8.5 COMMUNICATIONS <br /> 8.5.3 Mitigation Measures <br /> 1. All communication lines must be installed underground. <br /> 8.6 PUBLIC WATER SUPPLIES <br /> 8.6.3 Mitigation Measures <br /> 1. Looped water mains may be required for some sites to meet fire flow requirements and to <br /> protect water quality. Pressure reducing valves may be required when looped systems are <br /> constructed. <br /> 2. Developments must construct improvements necessary to provide a water pressure of 40-80 <br /> psi under normal operating conditions as required by Public Works. <br /> OTHER REQUIREMENTS <br /> f <br /> Public Works-Sabrina Fandler(425) 257-7813 <br /> 1. Construction permits, inspections, and final approvals are required for this project from City <br /> of Everett Permit Services. <br /> 2. A Public Works Permit is required for this project. Detailed drawings in accordance with the <br /> current City of Everett Design and Construction Standards and Specifications for <br /> Development shall be submitted to the Public Works Department, showing site parking <br /> layout, landscaping, utilities, storm drainage, temporary construction erosion and <br /> sedimentation control (TESC), and all required improvements in the public right-of-way. <br /> Public Works Department approval of these drawings is required prior to any permits being <br /> issued. All improvements shall be completed, approved, and warranted before the <br />
The URL can be used to link to this page
Your browser does not support the video tag.