My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW MTORRES AMERICA 2018-09-18
>
Address Records
>
80TH ST SW
>
905
>
MTORRES AMERICA
>
905 80TH ST SW MTORRES AMERICA 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 8:45:35 AM
Creation date
3/30/2018 2:31:54 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
MTORRES AMERICA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.1 ELECTRIC ENERGY <br /> 6.1.3 Mitigation Measures <br /> 1. All power lines carrying a voltage of less than 15 kV must be undergrounded. <br /> Section 7: ENVIRONMENTAL HEALTH <br /> 7.1 NOISE <br /> 7.1.1 Threshold <br /> All development in Everett must be in conformance with the requirements of EMC 20.08, the <br /> Noise Control Ordinance. Noise studies may be required to determine if a proposal is in <br /> conformance with the ordinance. <br /> 7.2 TOXIC/HAZARDOUSMATERIALS AND EXPLOSIVES <br /> 7.2.3 Mitigation Measures <br /> Construction Phase <br /> 1. Construction equipment and vehicles must be maintained so they do not leak fuels or <br /> lubricants. During construction, a staging area must be specified for all vehicle maintenance <br /> activities. The staging area must be located well away from all drainage courses. Where <br /> possible, all stormwater from related maintenance areas must be directed to the sanitary <br /> sewer, rather than the stormwater system. <br /> 2. During construction activities, all spills of fuel and hazardous materials must be contained <br /> and removed in such a manner as to prevent their entering the waters and soils of the State. <br /> Cleanup of spills must take precedence over other work on site. <br /> 3: During construction, all petroleum products,chemicals, and building materials that could <br /> contaminate runoff must be stored in a lined covered area. An impervious berm must be <br /> constructed around the perimeter of the storage area. The storage area must be located <br /> away from environmentally sensitive areas. <br /> 44. In order to expedite plan review, a hazardous materials inventory list shall be provided as a <br /> part of the submittal for building permits. The storage, handling and use of hazardous <br /> materials must be in compliance with Article 80 of the Uniform Fire Code, 1991 Edition. <br /> Operation Phase <br /> 5. Dumpsters must be covered and maintained, so that stormwater runoff from refuse does not <br /> enter storm drains or infiltrate into soil. <br /> 6. On sites containing hazardous materials, procedures to use in case of spills must be <br /> posted. <br /> 7. All chemicals or products of a hazardous or toxic nature that may be used or stored on the <br /> site must be stored under cover and isolated from the storm drainage system. <br /> /6 f <br /> /j14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.