Laserfiche WebLink
ccKIRTLEY <br /> i COLE �,� ak:: ,.� <br /> GENERAL CONTRACTOR <br /> July 17th,2017 <br /> Michael Kingsley <br /> Senior Project Manager <br /> MTorres America <br /> 21520 30th Drive SE,Suite 210 <br /> Bothell,WA 98021 <br /> Subject: Frontage,Water and Drainage Improvement Bond Values <br /> Dear Michael, <br /> During the Everett site inspection on 7/17/17 we were informed that maintenance bonds or guarantees are <br /> required for the frontage improvements,water main work and stormwater drainage work. Everett has <br /> indicated that they will issue a TCO if these bonds are in place on or before 7/28/17. Here is a breakdown <br /> of these costs for MTorres to submit a bond or guarantee to Everett. <br /> Frontage Improvements and Water Main Installation: <br /> Sidewalk improvements and concrete approaches. $10,000 <br /> Asphalt approaches and street patching. $5,000 <br /> Frontage Landscape Improvements. $20,000 <br /> Water main installation. $160,500 <br /> Total. ... $195,500 <br /> Stormwater Drainage Installation: <br /> Connecting to the existing main• Included Below <br /> Installation of storm main and structures. Included Below <br /> Vortex separator and Pond control structure. Included Below <br /> Backfill and Bedding. Included Below <br /> Testing and flushing of system. Included Below <br /> Total. $165,500 <br /> Sincerely, <br /> Kevin Brett <br /> Project Manager <br /> Kirtley Cole Associates <br />