My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW MTORRES AMERICA 2018-09-18
>
Address Records
>
80TH ST SW
>
905
>
MTORRES AMERICA
>
905 80TH ST SW MTORRES AMERICA 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 8:45:35 AM
Creation date
3/30/2018 2:31:54 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
MTORRES AMERICA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ccKIRTLEY <br /> i COLE �,� ak:: ,.� <br /> GENERAL CONTRACTOR <br /> July 17th,2017 <br /> Michael Kingsley <br /> Senior Project Manager <br /> MTorres America <br /> 21520 30th Drive SE,Suite 210 <br /> Bothell,WA 98021 <br /> Subject: Frontage,Water and Drainage Improvement Bond Values <br /> Dear Michael, <br /> During the Everett site inspection on 7/17/17 we were informed that maintenance bonds or guarantees are <br /> required for the frontage improvements,water main work and stormwater drainage work. Everett has <br /> indicated that they will issue a TCO if these bonds are in place on or before 7/28/17. Here is a breakdown <br /> of these costs for MTorres to submit a bond or guarantee to Everett. <br /> Frontage Improvements and Water Main Installation: <br /> Sidewalk improvements and concrete approaches. $10,000 <br /> Asphalt approaches and street patching. $5,000 <br /> Frontage Landscape Improvements. $20,000 <br /> Water main installation. $160,500 <br /> Total. ... $195,500 <br /> Stormwater Drainage Installation: <br /> Connecting to the existing main• Included Below <br /> Installation of storm main and structures. Included Below <br /> Vortex separator and Pond control structure. Included Below <br /> Backfill and Bedding. Included Below <br /> Testing and flushing of system. Included Below <br /> Total. $165,500 <br /> Sincerely, <br /> Kevin Brett <br /> Project Manager <br /> Kirtley Cole Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.