Laserfiche WebLink
i. Construction equipment and vehicles must be maintained so they do not leak fuels or <br /> lubricants. During construction, a staging area must be specified for all vehicle <br /> maintenance activities. The staging area must be located well away from all drainage <br /> courses. Where possible, all stormwater from related maintenance areas must be <br /> I directed to the sanitary sewer, rather than the stormwater system. <br /> ii. During construction activities, all spills of fuel and hazardous materials must be <br /> Icontained and removed in such a manner as to prevent their entering the waters and <br /> p soils of the State. Cleanup of spills must take precedence over other work on site. <br /> iii. During construction, all petroleum products, chemicals, and building materials that <br /> could contaminate runoff must be stored in a lined covered area. An impervious berm <br /> must be constructed around theperimeter of the storage area. The storage area must be <br /> located away from environmentally sensitive areas. <br /> iv. In order to expedite plan review, a hazardous materials inventory list shall be provided <br /> as a part of the submittal for building permits. The storage, handling and use of <br /> hazardous materials must be in compliance with Article 80 of the Uniform Fire Code, <br /> 1991 Edition. <br /> SoLeCA' <br /> esponse: The notes have been added to the revised Demolition & T.E.S.C. plans. ' &,0 4 <br /> f. Identify on the plan's landscaped areas that are to be planted to meet the 30sf of landscaped <br /> area per parking space, and provide area calculations showing the standard is met. <br /> Response: Area calculations will be provided on the Architectural Site Plan included with the <br /> building submittal. efP <br /> 3. Stormwater:Jane Zimmerman ---gtX TAN\ <br /> oil 6 \A\() <br /> a. A pre-treatment device that has received a General Use Level Designation (GULD) from <br /> Ecology for pretreatment of stormwater must be provided prior to discharge to the wet <br /> detention pond. The design of the chosen facility must meet the design criteria found in the <br /> Ecology GULD. The currently specified device in the stormwater design memorandum and <br /> shown on the plans has not received a GULD from Ecology for pretreatment. <br /> Response: The Hydro-International Downstream Defender, a GULD-approved pretreatment <br /> device, has been specified in the revised plans and the revised stormwater memorandum, <br /> included with this submittal. <br /> b. The grading plans must also show the grading and contours necessary for the channel <br /> construction, in addition to those for the pond and site areas. The grading in the bottom of the <br /> conveyance channel must be changed because it does not match the previously approved <br /> grading plan, or the wetland mitigation plan. The slope of the channel is to be 0.87% and the <br /> channel is widened in numerous areas. <br /> 1 <br />