Sabrina Fandler <br /> From: Sabrina Fandler <br /> Sent: Monday,June 27, 2016 1:12 PM <br /> To: 'Michael Kingsley' <br /> Cc: Jared VerHey; Harold Christensen; Sebastian Colio (MIDI); Steve Beck <br /> Subject: RE: Mtorres America Project <br /> Hi Michael, <br /> Everything you have outlined looks good to me.Your resubmittal will take place at the Permit Counter on the 2nd Floor <br /> of our office.The check for the bond and all associated paperwork can be processed at our permit counter by the Permit <br /> Technicians.The Permit Technicians will call me up to the counter if I am available to intake the resubmittal, however <br /> we require a transmittal sheet outlining everything that is being submitted and that package will make its way to my <br /> office for distribution and processing regardless if I intake or if the permit technicians do so.We are still waiting on <br /> revised plans in addition to the items you outlined below.Once these come back in,we will need to route them around <br /> for the different departments to backcheck their original comments.Once everyone has agreed that the plans are <br /> approved, I will stamp them and everyone will have to sign them.We will prepare all of the permits(Public Works <br /> Permit and Utility Permits)and notify you when the entire package is ready to go.At that time,you can stop by the <br /> Permit Counter to sign the permits, pay for them,and pick up the issuance package (approved plans, permits,additional <br /> permitting documents such as drainage reports, etc.). Fees are due upon issuance,at the time you come in to pick <br /> everything up. Nothing is due before then (with the exception of any Wetland/environmental items you worked out <br /> with John Jimerson). <br /> Recap of Permit Fees, revised to include the updated traffic mitigation fee: <br /> Public Works Permit total: $72,111.90 puJ ib03- ©SO <br /> PW permit fee breakdown: Grading/Fill/Excavate(158,000CY)=$1,385.00 <br /> Paving(199,800sf)=$999.00 <br /> PW Plan Review=$5,808.30 <br /> PW Site Inspection=$11,610.60 <br /> Traffic Mitigation=$52,312.00 <br /> System Development Fees will be applied on one of your utility permits.The system development charge is$37,75V9.03 <br /> Other Utility Permit line items are as follows: <br /> 1" irrigation meter=$560.00 01607-- a6'f <br /> 2" domestic meter=$990.00 Of Oil-- 663 <br /> %" detect meter for 8"fire service=$480.00 U/07--065 <br /> %" domestic meter for Lego Building=$480.00 U/0--062 <br /> There are 3 cost estimates currently being worked up by our Water Department,so those will be separate Utility <br /> Permits.We can let you know those fees once they are issued to us(and should be issued by mail to you as well).They <br /> are for the following: <br /> Chi I v ni- 1 1. Relocating hydrant on 80th St SW <br /> I unI1-#22. Connection to water main on west side of 80th St SW <br /> Reurtif#P3 3. Connection to water main on east side of 80th St SW <br /> Please let me know if you have any further questions, <br /> Sabrina Fandler, EIT, LEED®AP BD+C <br /> City of Everett Public Works Department I Development Technician <br /> 3200 Cedar St, Everett, WA 98201 <br /> y <br />