My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW MTORRES AMERICA 2018-09-18
>
Address Records
>
80TH ST SW
>
905
>
MTORRES AMERICA
>
905 80TH ST SW MTORRES AMERICA 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 8:45:35 AM
Creation date
3/30/2018 2:31:54 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
MTORRES AMERICA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Office: 425-257-8810 <br /> Direct: 425-257-7813 <br /> Email: SFandler@everettwa.gov <br /> AVitair WANKS <br /> The Permit Services Counter is located on the 2nd Floor. <br /> Hours of Operation: Monday-Friday 7:30am-12:00pm and 1:OOpm-4:OOpm. <br /> All emails, and attachments, sent to and from City of Everett are public <br /> records and may be subject to public disclosure pursuant to RCW 42.56. <br /> From: Michael Kingsley [mailto:MKingsley@MTorresAmerica.com] <br /> Sent: Monday, June 27, 2016 12:51 PM <br /> To: Sabrina Fandler <br /> Cc: Jared VerHey; Harold Christensen; Sebastian Colio (MTDI); Steve Beck <br /> Subject: Mtorres America Project <br /> Sabrina, <br /> We are finalizing the things that the owner needs to provide ahead of the Public Works Permit. <br /> • We are finalizing the language of the Letter of Access for Lot 1,and hope to have it signed by all parties in the <br /> next day or so now that Marty Robinett is back in his office. <br /> • We have the Assurance License signed and notarized. <br /> • The waterline easement is complete waiting for the legal description from the surveyor for the Exhibit. <br /> • After conversations between our Controller and John Jimerson,we will be making a deposit to the City in the <br /> amount of the Wetland Bond vs. obtaining a Bond. <br /> Please let me know if there is anything else. <br /> A question: When I bring you these documents, can you direct me to the correct procedure to get the check to the City? <br /> (I am assuming I don't give it to you.) <br /> A second question:What fees are due prior to issuance of the Public Works permit? Is it all of the Public Works <br /> breakdown below, including the revised Traffic Mitigation? <br /> C2/42) <br />
The URL can be used to link to this page
Your browser does not support the video tag.