Laserfiche WebLink
Office: 425-257-8810 <br /> Direct: 425-257-7813 <br /> Email: SFandler@everettwa.gov <br /> AVitair WANKS <br /> The Permit Services Counter is located on the 2nd Floor. <br /> Hours of Operation: Monday-Friday 7:30am-12:00pm and 1:OOpm-4:OOpm. <br /> All emails, and attachments, sent to and from City of Everett are public <br /> records and may be subject to public disclosure pursuant to RCW 42.56. <br /> From: Michael Kingsley [mailto:MKingsley@MTorresAmerica.com] <br /> Sent: Monday, June 27, 2016 12:51 PM <br /> To: Sabrina Fandler <br /> Cc: Jared VerHey; Harold Christensen; Sebastian Colio (MTDI); Steve Beck <br /> Subject: Mtorres America Project <br /> Sabrina, <br /> We are finalizing the things that the owner needs to provide ahead of the Public Works Permit. <br /> • We are finalizing the language of the Letter of Access for Lot 1,and hope to have it signed by all parties in the <br /> next day or so now that Marty Robinett is back in his office. <br /> • We have the Assurance License signed and notarized. <br /> • The waterline easement is complete waiting for the legal description from the surveyor for the Exhibit. <br /> • After conversations between our Controller and John Jimerson,we will be making a deposit to the City in the <br /> amount of the Wetland Bond vs. obtaining a Bond. <br /> Please let me know if there is anything else. <br /> A question: When I bring you these documents, can you direct me to the correct procedure to get the check to the City? <br /> (I am assuming I don't give it to you.) <br /> A second question:What fees are due prior to issuance of the Public Works permit? Is it all of the Public Works <br /> breakdown below, including the revised Traffic Mitigation? <br /> C2/42) <br />