My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1144-85
>
Ordinances
>
Ordinance 1144-85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 11:13:38 AM
Creation date
4/3/2018 11:13:37 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1144-85
Date
6/12/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> f. Grand Avenue - 42nd Street to 43rd Street <br /> Construct Curbs, install drainage and enclose open ditches <br /> on west side of the street. Construct new sidewalks on east <br /> side of the street. (This project will be matched by street <br /> overlay funds. ) <br /> D. Riverside <br /> 1. Allocate $3,000 of CDBG funds for the publication of oral histories <br /> of the Riverside History Project. (Will not be matched. ) <br /> 2. Allocate $500 for CDBG funds for a scholarship fund to provide <br /> financial assistance for low income kids to attend summer school . <br /> (Will not be matched. ) <br /> 3. Allocate $27,260 in CDBG funds and matching funds for the replace- <br /> ment of hazardous sidewalks throughout the Riverside Neighborhood. <br /> (This project will be matched by street overlay funds) . <br /> Section 3: Should costs be less for the above projects than originally <br /> estimated, projects receiving the next highest neighborhood priority shall <br /> be included for funding. If project costs exceed the estimates given, the <br /> lowest priority project or projects will be dropped for funding. <br /> Section 4: If any of the above projects is started but not completed, <br /> completion of the project(s) will be automatically funded with any 1986 <br /> Block Grant funds received by the neighborhood where an umcompleted project <br /> is located. <br /> Section 5: All of the above projects shall conform to the requirements of <br /> the City Ordinance 555-78, as amended by City Ordinances 655-80 and 793-82. <br /> Determination of the appropriate standards to impose shall be made by the <br /> City Engineer. <br /> Section 6: The total estimated cost of the improvements herein authorized is <br /> $123,040 which will include all costs related to design, construction, contract <br /> administration, plan development and associated costs . <br /> Section 7: The City Engineer of the City of Everett under the administration <br /> of the Mayor is hereby given the responsibility of providing for the <br /> improvements as defined herein. <br /> Section 8: The Mayor has also approved matching funding on a dollar per <br /> dollar basis from the street overlay fund for neighborhood improvements in <br /> Northeast, Lowell , Riverside and Port Gardner, provided that CDBG funds are <br /> expended for street and sidewalk improvement projects . <br /> Section 9: The City Treasurer of the City of Everett is hereby authorized <br /> to negotiate a reasonable rate of interest and issue interest bearing warrants <br /> to satisfy interim construction costs not to exceed $123,040. These interest <br /> bearing warrants shall be redeemed by the Treasurer as soon as reimbursement <br /> or long term bond financing monies, as described elsewhere in this Ordinance, <br /> are received. <br /> Section 10: <br /> A. The sum of $123,.0.40 is hereby appropriated to Fund No. 372, "1985 Block <br /> Grant Neighborhood Improvements", as follows: <br /> Program 330: Riverside Neighborhood Improvement $30,760 <br /> Program 331: Northeast Everett Neighborhood Improvement 30,760 <br /> Program 332: Lowell Neighborhood Improvement 30,760 <br /> Program 333: Port Gardner Neighborhood Improvement 30,760 <br /> $ 123,040 <br />
The URL can be used to link to this page
Your browser does not support the video tag.