Laserfiche WebLink
***********Compliance Point Results************* <br /> Scenario Predeveloped Compliance Subbasin: Subbasin 1 <br /> Scenario Postdeveloped Compliance Link: Detention Pond <br /> *** Point of Compliance Flow Frequency Data*** <br /> Recurrence Interval Computed Using Gringorten Plotting Position <br /> Predevelopment Runoff Postdevelopment Runoff <br /> Tr(Years) Discharge (cfs) Tr(Years) Discharge (cfs) <br /> 2-Year 0.305 2-Year 9.437E-02 <br /> 5-Year 0.389 5-Year 0.261 <br /> 10-Year 0.467 10-Year 0.373 <br /> 25-Year 0.600 25-Year 0.521 <br /> 50-Year 0.647 50-Year 0.569 <br /> 100-Year 0.703 100-Year 0.678 <br /> 200-Year 0.843 200-Year 0.781 <br /> ** Record too Short to Compute Peak Discharge for These Recurrence Intervals <br /> **** Flow Duration Performance**** <br /> Excursion at Predeveloped 50%Q2 (Must be Less Than 0%): -85.4% PASS <br /> Maximum Excursion from 50%Q2 to Q2 (Must be Less Than 0%): -57.5% PASS <br /> Maximum Excursion from Q2 to Q50 (Must be less than 10%): -16.1% PASS <br /> Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS <br /> MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS <br />