Stormwater Pollution Prevention Plan <br /> Coordination with Utilities and Other Jurisdictions: <br /> • Care has been taken to coordinate with utilities, other construction projects, and the local <br /> jurisdiction in preparing this SWPPP and scheduling the construction work. <br /> Inspection and Monitoring: <br /> • All BMPs shall be inspected, maintained, and repaired as needed to assure continued <br /> performance of their intended function. Site inspections shall be conducted by a person <br /> who is knowledgeable in the principles and practices of erosion and sediment control. <br /> This person has the necessary skills to: <br /> ❑ Assess the site conditions and construction activities that could impact the quality <br /> of stormwater, and <br /> ❑ Assess the effectiveness of erosion and sediment control measures used to control <br /> the quality of stormwater discharges. <br /> • The contractor shall have a Certified Erosion and Sediment Control Lead onsite or on call <br /> at all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP <br /> are inadequate, due to the actual discharge of or potential to discharge a significant <br /> amount of any pollutant, appropriate BMPs or design changes shall be implemented as <br /> soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> • This SWPPP shall be retained onsite or within reasonable access to the site. <br /> • The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant <br /> effect on the discharge of pollutants to waters of the state. <br /> • The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br /> stormwater discharges from the site. The SWPPP shall be modified as necessary to <br /> include additional or modified BMPs designed to correct problems identified. Revisions <br /> to the SWPPP shall be completed within seven(7) days following the inspection. <br /> The BMP implementation schedule will be driven by the construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the corresponding <br /> BMP implementation schedule. The list contains key milestones such as wet season construction. <br /> 14 <br />