My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
>
Address Records
>
N BROADWAY
>
819
>
WASHINGTON STATE UNIVERSITY
>
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 11:08:12 AM
Creation date
4/3/2018 2:53:01 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
819
Tenant Name
WASHINGTON STATE UNIVERSITY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Whenever possible,the entrance shall be constructed on a firm, <br /> compacted subgrade. This can substantially increase the effectiveness <br /> of the pad and reduce the need for maintenance. <br /> Maintenance • Quarry spalls (or hog fuel) shall be added if the pad is no longer in <br /> Standards accordance with the specifications. <br /> • If the entrance is not preventing sediment from being tracked onto <br /> pavement, then alternative measures to keep the streets free of <br /> sediment shall be used. This may include street sweeping, an increase <br /> in the dimensions of the entrance, or the installation of a wheel wash. <br /> • Any sediment that is tracked onto pavement shall be removed by <br /> shoveling or street sweeping. The sediment collected by sweeping <br /> shall be removed or stabilized on site. The pavement shall not be <br /> cleaned by washing down the street, except when sweeping is <br /> ineffective and there is a threat to public safety. If it is necessary to <br /> wash the streets,the construction of a small sump shall be considered. <br /> The sediment would then be washed into the sump where it can be <br /> controlled. <br /> • Any quarry spalls that are loosened from the pad, which end up on the <br /> roadway shall be removed immediately. <br /> • If vehicles are entering or exiting the site at points other than the <br /> construction entrance(s), fencing (see BMPs Cl 03 and Cl04) shall be <br /> installed to control traffic. <br /> • Upon project completion and site stabilization, all construction <br /> accesses intended as permanent access for maintenance shall be <br /> permanently stabilized. <br /> Driveway shall meet the <br /> requirements of the <br /> permitting agency <br /> It is recommended that <br /> the entrance be <br /> crowned so that runoff <br /> P02°1 <br /> yd drains off the pad <br /> Ott';t ter <br /> Mfr .r� oo- <br /> 0,4444,�1. <br /> Install driveway culvert �'�i� �:��; <br /> if there is a roadside `Y��'•;.'•� <br /> ditch present �'�` �•� <br /> 4"-8"quarry spalls <br /> Geotextile <br /> AN <br /> 12"min.thickness <br /> Provide full width of <br /> ingress/egress area <br /> Figure 4.2—Stabilized Construction Entrance <br /> February 2005 Volume ll— Construction Stormwater Pollution Prevention 4-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.