My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
>
Address Records
>
N BROADWAY
>
819
>
WASHINGTON STATE UNIVERSITY
>
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 11:08:12 AM
Creation date
4/3/2018 2:53:01 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
819
Tenant Name
WASHINGTON STATE UNIVERSITY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP C123: Plastic Covering <br /> Purpose Plastic covering provides immediate, short-term erosion protection to <br /> slopes and disturbed areas. <br /> Conditions of • Plastic covering may be used on disturbed areas that require cover <br /> Use measures for less than 30 days, except as stated below. <br /> • Plastic is particularly useful for protecting cut and fill slopes and <br /> stockpiles. Note: The relatively rapid breakdown of most polyethylene <br /> sheeting makes it unsuitable for long-term(greater than six months) <br /> applications. <br /> • Clear plastic sheeting can be used over newly-seeded areas to create a <br /> greenhouse effect and encourage grass growth if the hydroseed was <br /> installed too late in the season to establish 75 percent grass cover, or if <br /> the wet season started earlier than normal. Clear plastic should not be <br /> used for this purpose during the summer months because the resulting <br /> high temperatures can kill the grass. <br /> • Due to rapid runoff caused by plastic sheeting, this method shall not be <br /> used upslope of areas that might be adversely impacted by <br /> concentrated runoff. Such areas include steep and/or unstable slopes. <br /> • While plastic is inexpensive to purchase, the added cost of installation, <br /> maintenance, removal, and disposal make this an expensive material, <br /> up to $1.50-2.00 per square yard. <br /> • Whenever plastic is used to protect slopes, water collection measures <br /> must be installed at the base of the slope. These measures include <br /> plastic-covered berms, channels, and pipes used to covey clean <br /> rainwater away from bare soil and disturbed areas. At no time is clean <br /> runoff from a plastic covered slope to be mixed with dirty runoff from <br /> a project. <br /> • Other uses for plastic include: <br /> 1. Temporary ditch liner; <br /> 2. Pond liner in temporary sediment pond; <br /> 3. Liner for bermed temporary fuel storage area if plastic is not <br /> reactive to the type of fuel being stored; <br /> 4. Emergency slope protection during heavy rains; and, <br /> 5. Temporary drainpipe ("elephant trunk") used to direct water. <br /> 4-26 Volume Il—Construction Stormwater Pollution Prevention February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.