My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1120-85
>
Ordinances
>
Ordinance 1120-85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 10:11:09 AM
Creation date
4/5/2018 10:11:05 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1120-85
Date
3/29/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION III - FINAL BINDING SITE PLAN REVIEW PROCESS • <br /> A. Final Binding Site Plan Submitted <br /> B. Review Process <br /> C. File with Auditor <br /> D. Development <br /> A. Final Binding Site Plan Submitted <br /> 1. Compliance with Preliminary Approval: <br /> Prior to the submittal of any binding site plan to the City for <br /> final approval, the applicant must demonstrate compliance with <br /> all of the conditions of the preliminary approval and prepare all <br /> of the necessary final documents. <br /> 2. Binding Site Plan: <br /> The final binding site plan shall be drawn on mylar drafting film <br /> having dimensions of 18" x 24" and must include the following: <br /> a. The name of the binding site plan; <br /> b. Legal description of the entire parcel; <br /> c. The date, scale, and north arrow; <br /> d. Boundary lines, right-of-way for streets, easements, and <br /> property lines of lots and other sites with accurate <br /> bearings, dimensions or angles and arcs, and of all curve <br /> data; <br /> e. Names and right-of-way widths of all streets within the <br /> parcel and immediately adjacent to the parcel. Street <br /> names shall be consistent with the names of existing <br /> adjacent streets; <br /> f. Number of each lot and each block; <br /> g. Reference to covenants and special restrictions either to <br /> be filed separately or on the face of the binding site plan; <br /> h. Zoning setback lines, building sites when required by City; <br /> i. Location, dimensions and purpose of any easements, noting <br /> if the easements are private or public; <br /> j. Location and description of monuments and all lot corners <br /> set and found; <br /> k. Datum elevations and primary control points approved by the <br /> Public Works Department. Descriptions and ties to all <br /> control points will be shown with dimensions, angles, and <br /> bearings; <br /> 1. A dedicatory statement acknowledging public and private <br /> dedications and grants; <br /> m. Parking areas, general circulation, landscaping area when <br /> required; <br /> • <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.