My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
711 90TH PL SE 2018-04-05
>
Address Records
>
90TH PL SE
>
711
>
711 90TH PL SE 2018-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 1:15:14 PM
Creation date
4/5/2018 1:15:12 PM
Metadata
Fields
Template:
Address Document
Street Name
90TH PL SE
Street Number
711
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> //1111111111P <br /> m <br /> 0100 amp bus/100 amp main OCPD- 3,840 AC watts,maximum 20 amp inverter OCPD, <br /> DOther-Electrical Permit with Plan Review Required • <br /> Note 1:Listed un-altered factory main/bus combination.Alteration of the panelboard main OCPD will require plan review. <br /> Note 2:The circuit conductors and overcurrent devices shall be sized to carry not less than 125 percent of the maximum currents <br /> ds calculated in 690.8(A).The rating or setting of overcurrent devices shall be permitted in accordance with 240.4(8)and(C).NEC <br /> 690.8(8)(1) <br /> Note 3:If a panelboard employs a snap switch rated 30 amperes or less in any branch circuit it cannot be rated more than 200 <br /> amperes unless there is a supply side overcurrent protection at 200 amperes or less within the panelboard.This requirement does <br /> not apply to panelboards equipped with circuit breakers.Section 408.36(A)of the NEC. <br /> 7. I have attached the following Electrical One-Line Diagram: <br /> ❑Standard Electrical Diagram-6 Strings or Less <br /> ❑Standard Electrical Diagram-4 Strings or Less <br /> ❑Standard Electrical Diagram-Micro Inverter <br /> ©None of the above-Electrical Permit with Plan Review Required - <br /> Comments: <br /> - If you answered yes to all of the above questions,your project qualifies for over the Over-the- <br /> Counter electrical permit, <br /> I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not. The granting of a permit does <br /> not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the <br /> performance of construction. That I am authorized by the owner of this property to perform the work for which application is <br /> made and I comply with the State Contractors Law 18.27 RCW and 296.200 WAC. <br /> Applicant Signature: Date: <br /> a • ,`'( CO fZ 1, <br /> Applicant Name(Please print): <br /> Jeff Tovell <br /> TO BE COMPLETED BY CITY STAFF-- <br /> Qualifies for OTC Building Permit? ❑Yes ONo Permit Application#: <br /> Staff Initials Date: <br /> Qualifies for Electrical OTC? DYes ONo Permit#: <br /> Staff initials Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.