SCOPE OF WORK GENERAL NOTES: Snort Energy Today lnc.
<br /> PHOTOVOLTAIC SYSTEM SUMMARY 1. AN INVERTER OR AN AC MODULE IN AN INTERACTIVE PHOTOVOLTAIC SYSTEM SHALL AUTOMATIC ALL DE-ENERGIZE ITS OUTPUT TO THE SOLAR
<br /> CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN ,}
<br /> SYSTEM SIZE:DC STC-9.86 KW THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED.(NEC 690361). " £ y "
<br /> 2. ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT)CONDUIT FITTING SHALL BE RAIN TIGHT THREAD-LESS COMPRESSION TYPE. -' -
<br /> MODULES:(34)iTEK ENERGY IT290-SE SOLAR MODULE 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. :`
<br /> MODULE MX POWER(P/MAX):290W 4. NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE DISTRIBUTION AND POWER DISTRIBUTION SWITCH BOARDS,PANEL ,9 1001 Cooper Point Rd SW,
<br /> INVERTER:(17)BLUE FROG SOLAR VC500A-MIW BOARDS,DISCONNECTING SWITCHES,TERMINAL CABINETS,ETC.ALL NAMEPLATES SHALL BE PERMANENTLY ATTACHED AND BE OF - ^y, Suite 140-290
<br /> MICROINVERTER SUFFICIENT CAPACITY TO WITHSTAND THE WEATHER. AV,'' Olympia,WA 98502
<br /> ARRAY TILT: 5. JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN RELIEF POSITIONED FOR APPROPRIATE WATER RUN OFF. .. Phone:888-405-8689
<br /> ROOF#1:22° 6. CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OF JUNCTION BOX/COMBINER BOXES PER _ " _ Fax:855-350.9430
<br /> ROOF#2:22° APPROPRIATE NEC REQUIREMENTS. . - support@smartenergytoday.nel
<br /> 7. SEE PROVIDED CUT SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS. * -
<br /> AZIMUTH: B. WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND WET LOCATIONS.FIELD APPLIED PROTECTIVE COATINGS ARE NOT `" `.. REVISIONS
<br /> ROOF#1:222° ACCEPTABLE. SS DESCRIPTION DATE REV
<br /> ROOF#2:222° 9. JUNCTION.PULL AND OUTLET BOXES LOCATED BEHIND MODULES SHALL BE SO INSTALLED THAT THE WIRING CONTAINED IN THEM CAN BE 2..
<br /> ELECTRICAL INFORMATION RENDERED ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF MODULE(S)SECURED BY REMOVABLE FASTENERS AND CONNECTED BYA .= a MEDAL 06-27E017 00
<br /> COUNTY:SNOHOMISH FLEXIBLE WIRING SYSTEM.(NEC 690.34).
<br /> 10. IN AN UNDERGROUND PHOTOVOLTAIC SYSTEM,THE POWER SOURCE SHALL BE LABELED WITH THE FOLLOWING WARNING AT EACH
<br /> UTILITYAINSERVICECOMPANY:ENA PUD .�
<br /> MAIN AMPERAGE 200A(TOP FED) JUNCTION BOX,COMBINER BOX,DISCONNECT AND DEVICE WHERE THE UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE:°
<br /> WARNING-ELECTRIC SHOCK HAZARD.THE CURRENT CIRCUIT CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED Signature with Seal
<br /> !DING
<br /> INFORMATION:TWO STORY HOUSE BUT MAY BE ENERGIZED WITH THE RESPECTTO GROUND DUE TO LEAKAGE PATHS AND/OR GROUND FAULTS."(NEC 690.35(F)).F:COMPOSITE SHINGLE 11. ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROECTED FROM ANY PHYSICAL DAMAGE BER OF LAVERS:01 12. ALL ELECTRICAL DEVICES AND UTILIZATION EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY.UAL AVERAGE WIND SPEED:110 MPH 13. OUTDOOR EQUIPMENT SHALL BEAT LEAST NEMA 3R RATED.UND SNOW LOAD:20 PSF 14. ALL SPECIFIED WIRING IS BASED ON THE USE OF COPPER.
<br /> 15. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL COORDINATE ALL INSPECTION,COMMISSIONING AND ACCEPTANCE WITH ,
<br /> THE CLIENT,UTILITY CO.AND CITY INSPECTORS AS NEEDED. TSF
<br /> CODE SUMMARY
<br /> 16. DRAWINGS ARE DIAGRAMMATIC ONLY.ROUTING OF RACEWAYS SHALL BE AT THE OPTION OF THE CONTRACTOR UNLESS OTHERWISE
<br /> 2015 WASHINGTON STATE BUILDING CODE(2015 IBC) NOTED AND SHALL BE COORDINATED WITH OTHER TRADE.
<br /> 17. IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN,THE CONTRACTOR SHALL NOTIFY ELECTRICAL ENGINEER TO VALIDATE THE "
<br /> 2015 WASHINGTON STATE ENERGY CODE(2015 IECC) WIRE SIZE.FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. `s
<br /> 2015 WASHINGTON STATE RESIDENTIAL CODE 18. WHENEVER A DISCREPANCY IN QUANTITY OF EQUIPMENT.ARISES ON THE DRAWINGS OR SPECIFICATIONS,THE CONTRACTOR SHALL BE _ - ' PROJECT NAME&ADDRESS
<br /> (2015 INTERNATIONAL RESIDENTIAL CODE WASHINGTON RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE
<br /> AMENDM2014 WACENTS 296-46 14(2014CNEC)1 2300 SECTION M2302) DRAWINGS OR IN THE SPECIFICATIONS TO ENDURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY AERIAL VIEW
<br /> 2015 WASHINGTON STATE MECHANICAL CODE(2015 UMC) THE ARCHITECT/ENGINEER
<br /> 2015 WASHINGTON STATE PLUMBING CODE(2015 UPC) 19. ALL BROCHURES,OPERATION MANUALS,CATALOGS,SHOP DRAWINGS,ETC.SHALL BE HANDED OVER TO THE OWNER'S REPRESENTATIVE PV-0 SCALE:NTS
<br /> 2015 WASHINGTON STATE FIRE CODE(2015 IFC) AT THE COMPLETION OR WORK.
<br /> 20. ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN METAL CONDUIT. r ,ye !IP" =
<br /> 21. THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS SHALL BE IN ACCORDANCE WITH THE°SMACNA°-GUIDLINES FOR 1,-, ; µ, :#
<br /> SYSTE
<br /> 22. ALL OF THE LISSEISMIC RTED SINS OUS EMS REQUIRED THAT THE SEISMIC LATERAF MECHANICAL SYSTEMS AND PLUMING PIPINL FORCE F INCLUDING CONSIDERATION OF AAP AND RAP BE ' ) 7M> fit * < E
<br /> SHEETT INDEX DETERMINED AT EACH LEVEL OF THE BUILDING SO THAT BRACE SPACING CAN BE CALCULATED.THE DISTRICT STRUCTURAL ENGINEER f d r k' CO ca co OV
<br /> PV-0 COVER SHEET CAN APPROVE THE SEISMIC LATERAL FORCE DETERMINATION. ( ( Q c0
<br /> PV-1 PLOT PLAN WITH ROOF PLANS 23. A COPY OF THE CHOSEN BRACING SYSTEM(S)INSTALLATION GUIDE/MANUAL SHALL BE ON THE JOB SITE PRIOR TO STARTING THE .a r W r N
<br /> PV-2 ROOF PLAN WITH MODULES INSTALUNG OF HANGERS AND/OR BRACES. A y$ /8�4 s 0 Ufit:.Cdt 0 w O E
<br /> PV-3 ATTACHMENT DETAIL 24. WHEN INSTAWNG DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE,USE 44 Y = J cos d1�LA1
<br /> PV-4 ELECTRICAL LINE DIAGRAM CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE REINFORCED BARS.WHEN INSTALLING THEM INTO EXISTING PRESTRESSED *It, ,_ '.; u :` .T., J dN V
<br /> PV-5 PLACARDS CONCRETE TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION.EXERCISE EXTREME CARE AND CAUTION TO Q_co
<br /> PV-6.x MANUFACTURER SPEC SHEET AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION.MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE [ (1. „°x � 4 i. , J S N co
<br /> La
<br /> REINFORCEMENT AND THE DRILLED-IN ANCHOR. , w ,g -" p>- n
<br /> 25. THE WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL EQUIPMENT AS WELL AS THE NEW ELECTRICAL EQUIPMENT WILL BE ,,,. ^`y),y. y # g' "'�} L C
<br /> MAINTAINED IN ACCORDANCE WITH NEC 110.26. $ ;_' F L{f E
<br /> 26. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT.(NEC 300.6 01,310.8 D. ' "- • _ .4*4 ` IL Z
<br /> 27. GROUNDING BUSHINGS ARE REQUIRED AROUND PRE-PUNCHED CONCENTRIC KNOCKOUTS ON THE DC SIDE OF THE SYSTEM.(NEC 250.97) 4. - : 4' - I T7 W 2 J
<br /> 28. THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM PHYSICAL DAMAGE IF SMALLER THAN#6 COPPER WIRE.(NEC r a t#` t Lii° �"' t , w =
<br /> 250.648). # � + 4 '�`g' _ a., 0Q
<br /> 29. GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN USED EQUIPMENT. tT`&'r ` LLJ
<br /> • (NEC 250.64 C).
<br /> '" '�' " J^` ' % #;' l ,awi�,.-. w
<br /> 30. RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END.(CEC 250.64(E). t s K` ? +` xR , s F{U
<br /> 31. WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION,A SIGN WILL BE PROVIDED WARNING t ^u' `''4
<br /> OF THE HAZARD PER NEC 690.17.34.EACH UNGROUNDED CONDUCTOR OF THE MULT-IWIRE BRANCH CIRCUIT WILL BE IDENTIFIED PER :1„ w.m ;:+ * °4 `"Ap•
<br /> PHASE AND SYSTEM PER NEC210.5. a ) ;
<br /> 32. CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH NEC250.97&250.92(B)&LAMC 93.250.97. ' - 40 #1 >. I'a
<br /> 33. DC CONDUCTORS EITHER DO NOT ENTER THE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES TO THE FIRST Cf.\1 " i 9 ,,�---__««�----...1T1 I
<br /> ACCESSIBLE DC DISCONNECTING MEANS PER NEC 690.31(E),LAMC 93.690.31(E). J '.,
<br /> 34. ALL METALLIC FRAME RAILS AND OTHER CURRENT CARRYING METALLIC COMPONENTS(CONDUIT,JUNCTION&PULL BOXES,RACEWAY, olio q
<br /> NS LAMC
<br /> ).
<br /> 35. SCETREWS,NUTSSHALL BE, LY GROUNDED PER BOLTSWASHERS THATTHE ATTACH EQUIPMENTGROUNDINGSIWGS SHALL BIEOSTAINLESS STEELO.3&lAMC 93.110.388). w.f� ..a'
<br /> ¢¢ s SHEET NAME
<br /> 36. NO PIPING,DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE LOCATED WITHIN THE DEDICATED Y F '
<br /> SPACE ABOVE THE ELECTRICAL EQUIPMENT. S;' #t - ,i '� =# ° ' *' COVER SHEET
<br /> 37. ALL FIELD INSTALLED JUNCTION,PULL AND OUTLET BOXED LOCATED BEHIND MODULES OR PANELS SHALL BE ACCESSIBLE DIRECTLY OR ,, �, f: "wr ;'
<br /> BY DISPLACEMENT OF A MODULE(S)OR PANEL(S)SECURED BY REMOVABLE FASTENERS. :} ".,.
<br /> 38. REMOVAL OF A DWP-INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE �" - +„ ,4 SHEET SIZE
<br /> GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR. g '°I +qs.. t
<br /> 39. THE ROOF MOUNTED PHOTOVOLTAIC MODULES,PANELS,OR SOLAR VOLTAIC ROLL ROOFING MATERIAL SHALL HAVE THE SAME OR ' _ ` 4`�. '#s , g �. g ANSIB
<br /> BETTER LISTED FIRE-RESISTANCE RATING THAN THE BUILDING ROOF-COVERING MATERIAL.
<br /> 40. ALL ROOF MOUNTED CONDUIT WILL BE A MINIMUM 6°OFF THE ROOF SURFACE. _ '�'" 11"X 17"
<br /> 2 VICINITY MAP SHEET NUMBER
<br /> PV-0 SCALE:NTS PV-O
<br /> 1i/(10/.
<br />
|