Laserfiche WebLink
• <br /> I. Performance guarantees are required for street and landscaping <br /> improvements. <br /> J. A one year guarantee is required on the public street and <br /> landscaping for an amount not less ' than 10% of the cost of <br /> • <br /> construction and shall run for one year from the date of issuance <br /> of the first Occupancy Permit for the project. <br /> K. A two year guarantee is required for any drainage <br /> treatment/abatement facilities serving areas larger than one (I) <br /> acre. <br /> L. Any on-site water mains will be staked within an easement to the <br /> city. The easement will be submitted to the city prior to <br /> issuance of permits. <br /> M. As-builts of storm sewer, sanitary sewer, and water systems will <br /> be required to be submitted in the form of the original approved <br /> construction plan or photo mylar and shall be submitted before <br /> the Occupancy Permit is issued. <br /> • <br /> 8. Congregate Care Facility Limitations: <br /> A. Age Limit: That the entry age for residency in the congregate <br /> care facility be a minimum of 60 years of age with the exception , <br /> that younger spouses will be permitted in the facility. <br /> B. Meal Arrangements: That the fee structure for the congregate <br /> care facility reflect one meal per day in the common dining room. <br /> -4- <br />