My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
420 47TH ST SE 2015 2025-07-17
>
Address Records
>
47TH ST SE
>
420
>
420 47TH ST SE 2015 2025-07-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 3:07:54 PM
Creation date
4/12/2018 3:19:06 PM
Metadata
Fields
Template:
Address Document
Street Name
47TH ST SE
Street Number
420
Permit
CW1505-002
Year
2015
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 's <br /> 6. The area where the proposed garage is to be built on is fill material. All footings shall <br /> rest on undisturbed soil. Provide foundation design based on the original grade before <br /> the fill was placed or provide soils analysis prepared by a licensed geotechnical engineer <br /> for the construction of the garage on structural fill. <br /> 7. Show how the dwelling meets the requirements of the Washington State Energy Code <br /> (WSEC) including R-Value for floors, walls, ceilings. U-value for all new windows and <br /> doors and specify energy credits from table 406.2 of the WSEC. Concrete floors in <br /> conditioned spaces are required to have a minimum 24 inches of R-10 rigid insulation <br /> with thermal break at the perimeter of the slab, including thermal break at slab where <br /> the conditioned space transitions into the garage. <br /> 8. Provide Ventilation Calculations for the ceilings. The plans for the roof over the Master <br /> Bedroom call out 2 x 8 rafters with R-30 (R-38 required) insulation, which would not <br /> leave space for ventilation over the insulation. The plans show 2 x 12 rafters over the <br /> living room area with R-38 insulation which would not provide sufficient depth for <br /> ventilation over the insulation. <br /> 9. Provide detail of the guard construction along the stairs at the second floor. <br /> Please prepare a response letter showing where each item in this <br /> correction letter is addressed on the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Jeff Heilman <br /> Development Technician <br /> 425-257-8976 <br /> Email: iheilman©ci.everett.wa.us <br /> (I;-1,:j <br /> S:\SCommon\Clerical\]Heilman\CW1505-002(420 47th ST SE).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.