<br /> -
<br /> A. GENERAL D. RACEWAYS AND BOXES I
<br /> 1. EXAMINE THE SITE CONDITIONS VERY CAREFULLY AND THE SCOPE OF PROPOSED WORK TOGETHER WITH 1. ALL CONDUIT SHALL BE UL LABELED.
<br /> THE WORK OF ALL OTHER TRADES AND INCLUDE IN THE BID PRICE ALL COSTS FOR WORK SUCH AS 2. ALL EMPTY CONDUITS INSTALLED FOR FUTURE USE SHALL HAVE A PULL CORD. at&t
<br /> EQUIPMENT AND WIRING MADE NECESSARY TO ACCOMMODATE THE ELECTRICAL SYSTEMS SHOWN AND ' Your World.Delivered.
<br /> SYSTEMS OF OTHER TRADES. 3. SHEET METAL BOXES SHALL CONFORM TO NEMA OS1; CAST-METAL BOXES SHALL
<br /> CONFORM TO NEMA 81 AND SHALL BE SIZED IN ACCORDANCE WITH NEC UNLESS
<br /> 2. SUBMITTAL OF BID INDICATES CONTRACTOR IS COGNIZANT OF ALL JOB SITE CONDITIONS AND WORK TO NOTED OTHERWISE.
<br /> BE PERFORMED UNDER THIS CONTRACT.
<br /> 3. PERFORM DETAILED VERIFICATION OF WORK PRIOR TO ORDERING THE ELECTRICAL EQUIPMENT AND E. GROUNDING
<br /> COMMENCING CONSTRUCTION. ISSUE A WRITTEN NOTICE TO THE CONSULTANT OF ANY DISCREPANCIES. I
<br /> 4. OBTAIN ALL PERMITS, PAY ASSOCIATED FEES AND SCHEDULE INSPECTION. 1. ALL SAFETY GROUNDING OF THE ELECTRICAL EQUIPMENT SHALL BE CARRIED OUT T"
<br /> 5. PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, INSURANCE, AND SERVICES TO COMPLETE THIS PROJECT IN IN ACCORDANCE WITH THE CURRENT REVISION NEC. wPSrOWL�R
<br /> I ACCORDANCE WITH THE CONTRACT DOCUMENTS AND PRESENT IT AS FULLY OPERATIONAL TO THE 2. GROUND LUGS ARE SPECIFIED UNDER SECTION 3 "CONDUCTORS AND COMMUNICATIONS
<br /> SATISFACTION OF THE OWNER. CONNECTORS". I
<br /> 6. CARRY OUT WORK IN ACCORDANCE WITH ALL GOVERNING STATE, COUNTY AND LOCAL CODES AND 3. ALL GROUND LUG AND COMPRESSION CONNECTIONS SHALL BE COATED WITH -
<br /> O.S.H.A. ANTI-OXIDANT AGENT, SUCH AS NO-OX, NOALOX, PENETROX OR KOPRSHIELD.
<br /> 7. PRIOR TO BEGINNING WORK COORDINATE ALL POWER AND TELCO WORK WITH THE LOCAL UTILITY COMPANY
<br /> AS IT MAY APPLY TO THIS SITE. ALL WORK TO COMPLY WITH THE RULES AND REGULATIONS OF THE 4. GROUND ALL EXPOSED METALLIC OBJECTS ON BUILDING EXTERIOR INCLUDING
<br /> UTILMES INVOLVED. BUILDING TIE DOWN BRACKETS. +T GRP
<br /> 8. FABRICATION AND INSTALLATION OF THE COMPLETE ELECTRICAL SYSTEM SHALL BE DONE IN A FIRST i 1717 S.BOULDER
<br /> CLASS WORKMANSHIP PER NECA STANDARD 1-2000 BY QUALIFIED PERSONNEL EXPERIENCED IN SUCH 5. PROVIDE LOCK WASHERS FOR ALL MECHANICAL CONNECTIONS FOR GROUND I SUITE300
<br /> WORK AND SHALL SCHEDULE THE WORK IN AN ORDERLY MANNER SO AS NOT TO IMPEDE PROGRESS OF CONDUCTORS. USE STAINLESS STEEL HARDWARE THROUGHOUT. i TULSA,OK 74119
<br /> THE PROJECT. 6. DO NOT INSTALL GROUND RING OUTSIDE OF PROPERTY LINE. PH: (918)587.4630
<br /> www.btgrp.com
<br /> 9. DURING PROGRESS OF THE WORK, MAINTAIN AN ACCURATE RECORD OF THE INSTALLATION OF THE 7, REMOVE ALL PAINT AND CLEAN ALL DIRT FROM SURFACES REQUIRING GROUND -
<br /> ELECTRICAL SYSTEMS, LOCATING EACH CIRCUIT PRECISELY AND DIMENSIONING EQUIPMENT, CONDUIT AND
<br /> CABLE LOCATIONS. UPON COMPLETION OF THE INSTALLATION, TRANSFER ALL RECORD DATA TO BLACK CONNECTIONS, REPAINT TO MATCH AFTER CONNECTION IS MADE TO MAINTAIN I
<br /> LINE PRINTS OF THE ORIGINAL DRAWINGS AND SUBMIT THESE DRAWINGS AS RECORD DRAWINGS TO THE CORROSION RESISTANCE.
<br /> CONSULTANT. 8. ALL EXTERIOR GROUNDING CONDUCTORS INCLUDING EXTERIOR GROUND RING WA2821
<br /> SHALL R #2 AWG SOUD BAREOTINNED COPPER. MAKEBALL GROUNDHCONNECTIONS OANYE ♦ ERETT
<br /> I10. COMPLETE JOB SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER THE DATE OF JOB AS SHORT AND DIRECT AS POSSIBLE. AVOID SHARP BENDS. THE RADIUS OF ANY
<br /> ACCEPTANCE BY OWNER. ANY WORK, MATERIAL, OR EQUIPMENT FOUND TO BE FAULTY DURING THAT BEND SHALL NOT BE LESS THAN 8" AND THE ANGLE OF ANY BEND SHALL NOT
<br /> PERIOD SHALL BE CORRECTED AT ONCE UPON WRITTEN NOTIFICATION, AT THE EXPENSE OF THE EXCEED 90'. GROUNDING CONDUCTORS SHALL BE ROUTED DOWNWARD TOWARD '
<br /> CONTRACTOR. THE BURIED GROUND RING. WALNUT/� T TT TT
<br /> 11. GENERAL CONTRACTOR IS RESPONSIBLE FOR REQUESTING CONNECTION OF COMMERCIAL POWER FROM THE 9. REPAIR ALL GALVANIZED SURFACES THAT HAVE BEEN DAMAGED BY VN h 1 �lv V
<br /> POWER COMPANY. ELECTRICAL CONTRACTOR SHALL COORDINATE THIS WORK WITH THE GENERAL THERMO-WELDING WTTH ERICO T-319 GALVANIZING BAR.
<br /> CONTRACTOR.
<br /> 12. COORDINATE EXACT TELEPHONE REQUIREMENTS AND SERVICE ROUTING WITH LOCAL TELEPHONE COMPANY. 10. ALL GROUND CONNECTIONS SHALL BE APPROVED FOR THE METALS BEING 3200 20TH STREET
<br /> APPLY FOR TELEPHONE SERVICE IMMEDIATELY UPON AWARD OF CONTRACT. CONNECTED. EVERETT,WA 98201
<br /> 11. ALL EXTERNAL GROUND CONNECTIONS SHALL BE EXOTHERMICALLY WELDED. ALL
<br /> B. BASIC MATERIALS AND METHODS EXOTHERMIC WELDS TO EXTERIOR GROUND RING SHALL BE THE PARALLEL TYPE,
<br /> EXCEPT FOR THE GROUND RODS WHICH ARE TEE EXOTHERMIC WELDS. REPAIR ALL EXISTING
<br /> GALVANIZED SURFACES THAT HAVE BEEN DAMAGED BY EXOTHERMIC WELDING. USE MONOPOLE
<br /> 1. ALL ELECTRICAL WORK SHALL CONFORM TO THE EDITION OF THE NEC ACCEPTED BY THE LOCAL SPRAY GALVANIZER SUCH AS HOLUB LECTROSOL #15-501.
<br /> JURISDICTION AND TO THE APPLICABLE LOCAL CODES AND REGULATIONS.
<br /> 2. ALL MATERIALS AND EQUIPMENT SHALL BE NEW. MATERIALS AND EQUIPMENT SHALL BE THE STANDARD 12. CONTRACTOR SHALL NOTIFY AT&T WHEN THE BURIED GROUND RING IS INSTALLED
<br /> PRODUCTS OF MANUFACTURER'S CURRENT DESIGN. ANY FIRST-CLASS PRODUCT MADE BY A REPUTABLE SO THE REPRESENTATIVE CAN INSPECT THE GROUND RING BEFORE IT IS I
<br /> MANUFACTURER MAY BE USED PROVIDING IT CONFORMS TO THE CONTRACT REQUIREMENTS AND MEETS BACKFILLED WITH SOIL. CONTACT: AT&T PROJECT MGR. PROJECT NO: 90146.001
<br /> THE APPROVAL OF THE CONSULTANT AND THE OWNER. 13. FOR METAL FENCE POST GROUNDING, USE A HEAVY DUTY TYPE GROUNDING CHECKED BY: LRT
<br /> 3. ARRANGE CONDUIT, WIRING, EQUIPMENT, AND OTHER WORK GENERALLY AS SHOWN, PROVIDING PROPER CLAMP OR EXOTHERMIC WELD CONNECTION TO POST.
<br /> CLEARANCES AND ACCESS. CAREFULLY EXAMINE ALL CONTRACT DRAWINGS AND FIT THE WORK IN EACH ISSUED FOR:
<br /> 0 14. WHERE MECHANICAL CONNECTORS (TWO-HOLE OR CLAMP) ARE USED, APPLY A
<br /> LOCATION WITHOUT SUBSTANTIAL ALTERATION. WHERE DEPARTURES ARE PROPOSED BECAUSE OF FIELD ( REV DATE DRWN DESCRIPTION
<br /> LIBERAL PROTECTIVE COATING OF AN ANTI-OXIDE COMPOUND SUCH AS "NO OXIDE
<br /> 2 i CONDITIONS OR OTHER CAUSES, PREPARE AND SUBMIT DETAILED DRAWINGS FOR ACCEPTANCE. A 4/10/14 Mow PRELIMINARY
<br /> oA" BY DEARBORN CHEMICAL COMPANY ON ALL CONNECTORS. B I A 4/14/14 SAMHDW PRELIMINARY
<br /> 4. THE CONTRACT DRAWINGS ARE GENERALLY DIAGRAMMATIC AND ALL OFFSETS, BENDS, FITTINGS AND
<br /> 15. BOND ALL EXTERIOR CONDUITS, PIPES AND CYLINDRICAL METALLIC OBJECTS WITH I 0 5/16/14 SMM CONSTRUCTION
<br /> I ACCESSORIES ARE NOT NECESSARILY SHOWN. PROVIDE ALL SUCH ITEMS AS MAY BE REQUIRED TO FIT A PENN-UNION GT SERIES CLAMP, BLACKBURN GUV SERIES CLAMP OR A BURNDY I
<br /> * I THE WORK TO THE CONDITIONS. GAR 3900BU SERIES CLAMP ONLY, NO SUBSTITUTES ACCEPTED. 1 5/28/14 SMM CONSTRUCTION
<br /> N 2 8/1 /14 SMM CONSTRUCTION
<br /> 5. MAINTAIN ALL CLEARANCES AS REQUIRED BY NEC.
<br /> •
<br /> o 6. SEAL AROUND CONDUITS AND AROUND CONDUCTORS WITHIN CONDUITS ENTERING THE MODULAR CABINETS
<br /> WHERE PENETRATION OCCURS WITH A SILICONE SEALANT TO PREVENT MOISTURE PENETRATION INTO B&T ENGINEERING, INC.
<br /> < I BUILDING.
<br /> 7. SILICONE SEAL AROUND ALL BOLTS AND SCREWS USED TO SECURE EQUIPMENT TO EXTERIOR OF I •
<br /> BUILDING. `"I a N ir,6,,,p'
<br /> E 41 c 0.
<br /> 8. MAKE NECESSARY CONNECTIONS FOR BATTERY IN EMERGENCY LIGHT FIXTURE. CONNECT EXTERIOR LIGHT + CP'RIAs Mr ,G
<br /> iii FIXTURE (PROVIDED BY SHELTER MANUFACTURER) TO EXTERNAL JUNCTION BOX. et-- lob s
<br /> I � C. CONDUCTORS AND CONNECTORS
<br /> I•
<br /> v i 1. UNLESS NOTED OTHERWISE, ALL CONDUCTORS SHALL BE COPPER, MINIMUM SIZE #l2 AWG, WITH 43,
<br /> v) I THERMOPLASTIC INSULATION CONFORMING TO NEMA WC5 OR CROSS-LINKED POLYETHYLENE INSULATION �� .4� '��
<br /> I I CONFORMING TO NEMA WC7. (TYPES THHN OR THWN). INSULATION SHALL BE RATED FOR 90 CONDUCTORS C
<br /> SHALL BE COLOR CODED IN ACCORDANCE WITH NEC.
<br /> 1,+y„
<br /> M 2. ALL CONDUCTORS USED FOR GROUNDING SHALL BE COPPER AND SHALL HAVE GREEN INSULATION. 4)4�((
<br /> I,
<br /> ro 3. FOR COPPER CONDUCTORS #6 AWG AND SMALLER USE 3M SCOTCH-LOK OR T&B STA-KON COMPRESSION
<br /> J TYPE CONNECTORS WITH INTEGRAL OR SEPARATE INSULATION CAPS. FOR COPPER CONDUCTORS LARGER sr IS A VIOLATION OF LAW FOR NW PERSON.
<br /> THAN #6 AWG USE SOLDERLESS, !DENT HEX SCREW OR BOLT TYPE PRESSURE CONNECTORS OR DOUBLE I UNLESS OFTHEY N��TNE�N�DIRECTION
<br /> COMPRESSION C-CLAMP CONNECTORS, UNLESS SPECIFIED OTHERWISE ON DRAWINGS. TO ALTER THIS DOCUMENT.
<br /> 4. UNLESS NOTED OTHERWISE ALL LUGS SHALL BE TIN PLATED COPPER, TWO-HOLE, LONG BARREL, I SHEET NUMBER: REVISION:
<br /> COMPRESSION TYPE. I
<br /> 4- 5. CONDUCTOR LENGTHS SHALL BE CONTINUOUS FROM TERMINATION TO TERMINATION WITHOUT SPLICES. I (Iii- 2
<br /> b SPLICES ARE NOT ACCEPTABLE. IF SPLICES ARE UNAVOIDABLE PRIOR APPROVAL FROM THE ENGINEER i
<br /> °) MUST BE OBTAINED.
<br /> i