My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3200 20TH ST A T AND T MOBILITY ANTENNA 2019-11-13
>
Address Records
>
20TH ST
>
3200
>
A T AND T MOBILITY ANTENNA
>
3200 20TH ST A T AND T MOBILITY ANTENNA 2019-11-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 1:33:45 PM
Creation date
4/16/2018 9:14:46 AM
Metadata
Fields
Template:
Address Document
Street Name
20TH ST
Street Number
3200
Tenant Name
A T AND T MOBILITY ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUNDING NOTES <br /> 0 <br /> O (E) GROUND BUSS BAR, TYP. at 4 t <br /> _--.: O� <br /> O (E) MAIN GROUND CONNECTION POINT. (V.I.F.) ._. Your World.Delivered. <br /> I <br /> 0 (E) ANTENNA MOUNT STRUCTURE <br /> O (E) #2 STRANDED GREEN INSULATED <br /> COPPER GROUNDING LEAD, TYP. (V.I.F.) 401:!1", <br /> O <br /> PROPOSED #2 STRANDED GREEN INSULATED WES1 OWERT" <br /> COPPER GROUNDING LEAD, TYP. COMMUNICATIONS <br /> I O PROPOSED GROUND CONNECTION TO RRH <br /> di'? BST GRP <br /> `1 1717 S.BOULDER <br /> SUITE 300 <br /> _ � TULSA,OK 74119 <br /> %�': ® N _ PH: O 7411930 <br /> %CI- % GROUNDING NOTES Www.btgrp.com <br /> 1. ALL DETAILS ARE SHOWN IN GENERAL TERMS. ACTUAL <br /> \\/� INSTALLATION AND CONSTRUCTION MAY VARY DUE TO SITE <br /> SPECIFIC CONDITIONS. <br /> WA2821 <br /> N--- �I_f ...... 2. GROUND ALL ANTENNA BASES, FRAMES, CABLE RUNS AND OTHER <br /> �\ METALLIC COMPONENTS USING GROUND WIRES AND CONNECT TO <br /> ' o© ,� © SURFACE MOUNTED GROUND BARS. FOLLOW ANTENNA AND BTS EVERETT <br /> ��A. I , 0 MANUFACTURER'S PRACTICES FOR GROUNDING REQUIREMENTS. <br /> aa.iN1 `——��� ' GROUND COAX SHIELD AT BOTH ENDS AND EXIT FROM TOWERL 'IrtWALNUT <br /> / \ �' OR POLE USING MFR'S PRACTICES. <br /> / © / ® %i 3. ALL GROUND CONNECTIONS SHALL BE CADWELD. ALL WIRES <br /> �‘ _ /4 SHALL BE COPPER THNN/THWN. ALL GROUND WIRE SHALL BE <br /> 3200 20TH STREET <br /> / i 41 PA --° GREEN INSULATED WIRE ABOVE GROUND. <br /> 1. <br /> EVERETT WA 98201 <br /> MEM <br /> m.r ►0/ _ ' <br /> ���� 4. CONTRACTOR TO VERIFY AND TEST GROUND TO SOURCE. <br /> / - GROUNDING AND OTHER OPERATIONAL TESTING WILL BE <br /> 67 1� WITNESSED BY AN AT&T WIRELESS, LLC. REPRESENTATIVE. EXISTING <br /> 1141 <br /> ' ___$._—�)Iii / 5. REFER TO DIVISION 16 GENERAL ELECTRIC; GENERAL ELECTRICAL MONOPOLE <br /> / I 11111111KIVAIII \ re" wirii.„ <br /> NV ( ...... <br /> �-` PROVISION AND COMPLY WITH ALL REQUIREMENTS OF GROUNDING <br /> •I. STANDARDS. <br /> 0 6. ELECTRICAL CONTRACTORS TO PROVIDE DETAILED DESIGN OF PROJECT NO: 90146.001 <br /> ,I ,A ' ‘ '///// GROUNDING SYSTEM, AND RECEIVE APPROVAL OF DESIGN BY <br /> AUTHORIZED AT&T WIRELESS, LLC. REPRESENTATIVE, PRIOR TO CHECKED BY: LRT <br /> INSTALLATION OF GROUNDING SYSTEM. PHOTO DOCUMENT ALL <br /> ' 11111;., CADWELDS AND GROUND RING. ISSUED FOR: <br /> o I 4 7. NOTIFY CONSTRUCTION MANAGER IF THERE ARE ANY DIFFICULTIES REV DATE DRVVN DESCRIPTION <br /> ,— INSTALLING GROUNDING SYSTEM DUE TO SITE SOIL CONDITIONS. A 4/10/14 MDW PRELIMINARY <br /> 4../ <br /> B 4/14/14 SMM PRELIMINARY <br /> I lirLi GROUNDING ROD NOTES 0 5/16/14 SMM CONSTRUCTION <br /> I1 5/28/14 SMM CONSTRUCTION <br /> 51. <br /> i kV <br /> ` 1. ELECTRICAL CONTRACTOR SHALL ORDER GROUND RESISTANCE 2 8/1/14 SMM CONSTRUCTION- I ,,/v///, TESTING ONCE THE GROUND SYSTEM HAS BEEN INSTALLED; A <br /> QUALIFIED INDIVIDUAL, UTILIZING THE FALL OF POTENTIAL METHOD, <br /> SHOULD PERFORM THE TEST. THE REPORT WILL SHOWN THE B&T ENGINEERING, INC. <br /> LOCATION OF THE TEST AND CONTAIN NO LESS THAN 9 TEST <br /> POINTS ALONG THE TESTING LINE, GRAPHED OUT TO SHOW THE <br /> I PLATEAU. <br /> 2. POINT GROUND TEST OR 3 POINT 62% TESTS WILL NOT BE �;�' 0Ai <br /> E ACCEPTED AS ALTERNATIVES TO THE AFOREMENTIONED GROUND Q IA <br /> �� <br /> TESTS. TEST SHALL BE PERFORMED WHILE THE COUNTERPOISE IS <br /> ISOLATED FROM THE A/C SYSTEM GRIDS AND EXISTING A <br /> I COMMUNICATIONS FACILITY. tifi:° '` a <br /> LEGENDii <br /> o ® COPPER GROUND ROD _ 7` <br /> ' i <br /> ® GROUND INSPECTION WELL • 4.1, <br /> N * COMPRESSION LUG <br /> 13.) • R R A Vp1ATION OF LAW FOR ANY PERSON, <br /> CADWELD CONNECTION. IT <br /> TREY ARE ACTINO UNDER THE DIRECTION. <br /> I OF A L TM <br /> PRO�ENGINEER. <br /> '' TO ALTER <br /> • ENT. <br /> MECHANICAL CONNECTION <br /> ii 0 GROUNDING PLAN ,il�ll — i SHEET NUMBER REVISION: <br /> © — GROUND WIRE <br /> co <br /> SCALE: N.T.S. n <br /> @ IIIIF—— VERIFY & TIE INTO EXISTING GROUNDING SYSTEM G_2 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.