Laserfiche WebLink
/ Interior Lighting Sunk.riary LTG-SUM <br /> 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014 <br /> Project Info Project Address Bridgeways Date 9/22/2015 <br /> Compliance Soundview Center Buiding A For Building Department Use <br /> forms do not <br /> require a Everett,WA <br /> password to Applicant Name: <br /> use. Instructional Lance Mueller Architects <br /> and calculating Applicant Address: 130 Lakeside,Suite 250 <br /> cells are write- <br /> protected. Applicant Phone: 206-325-2553 <br /> Project Description ❑ New Building 0 Addition ID Alteration 0 Plans Included <br /> Lighting Power Density Calculations 0 Total Building Performance <br /> Lighting Compliance Path o <br /> (If Total Building Performance then only LGT-CHK is required.) <br /> Lighting Power Allowance <br /> O Building Area Method OQ Space-By-Space Method <br /> Method Selection required to <br /> enable LPA forms <br /> Interior Lighting System New flourescent and incandescent lighting within existing building. Tenant space has not <br /> Description been occupied before. New ceiling and light fixtures will be provided per this permit. <br /> All lighting controls,occupancy sensors and commisioning will be by electrical contractor. <br /> Briefly describe lighting <br /> system type and features. <br /> Additions and Change of Space Use (C101.4.3 &C101.4.4) <br /> ❑ Addition area or Change of Space Use area complies with all applicable provisions as stand alone project <br /> ❑ Addition area is combined with existing building lighting systems to demonstrate compliance with all applicable <br /> provisions per C101.4.3 <br /> Provide Building Area Method(LTG-INT-BLD)or Space-By-Space Method(LTG-INT-SPACE)Compliance Form.Document maximum <br /> allowed and proposed(including existing if applicable)lighting wattage of Addition or Change of Use space.Provide applicable lighting <br /> controls per C405.2 and commissioning of lighting controls per C405.13. <br /> Alterations,Renovations and Repairs (C101.4.3.1) <br /> ❑ 60%or more of luminaires in space replaced <br /> Provide Building Area Method(LTG-INT-BLD)or Space-By-Space Method(LTG-INT-SPACE)Compliance Form.Document maximum <br /> allowed wattage within the lighting retrofit space in Maximum Allowed Wattage table and proposed(including existing)lighting wattage in <br /> Proposed Wattage table.Retrofit and non-retrofit spaces shall be documented separately using multiple forms. <br /> ❑ Less than 60%of luminaires in space replaced <br /> Provide a separate Space-By-Space Method(LTG-INT-SPACE)Compliance Form for this retrofit area.Document existing total wattage <br /> within the lighting retrofit space in cell provided in the Maximum Allowed Wattage table.Document proposed(including existing)lighting <br /> wattage in the Proposed Wattage table. <br /> ❑ Lamp and/or ballast replacement within existing luminaires only—existing total interior building wattage not increased <br /> O New wiring installed to serve added fixtures and/or fixtures relocated to new circuit <br /> Provide applicable manual lighting controls(C405.2.1),occupancy sensors(C405.2.2.2),daylight zone controls(C405.2.2.3),specific <br /> application controls(C405.2.3),and commissioning of lighting controls per C405.13 <br /> ❑ New or moved lighting panel <br /> Provide all applicable lighting controls as noted for New Wiring,automatic time switch controls(C405.2.2.1),and commissioning of lighting <br /> controls per C405.13. <br /> ❑ Space is reconfigured-luminaires unchanged or moved only <br /> Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br /> O No changes are being made to the interior lighting and space use not changed. <br />