My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> a. Labor <br /> lb. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment <br /> for which a Contract Claim is made or in the absence of actual <br /> cost, the rates established by the AGC/WSDOT Equipment <br /> Rental Agreement that was in effect when the Work was <br /> performed. In no case shall the amounts sought or paid for <br /> each piece of equipment exceed the rates established by the <br /> Equipment Rental Agreement even if the actual cost for such <br /> equipment is higher. The City may audit the Contractor's cost <br /> records to determine actual equipment cost. The following <br /> information shall be provided for each piece of equipment: <br /> i. Detailed description (e.g., Motor Grader Diesel <br /> Powered Caterpillar 12 "G", Tractor Crawler ROPS & <br /> ' Dozer Included Diesel, etc.) <br /> ii. The hours of use or standby; and <br /> iii. The specific day and dates of use or standby; <br /> iv. Job overhead. <br /> v. Overhead (general and administrative). <br /> vi. Subcontractor's Contract Claims (in the same level of <br /> detail as specified herein is required for any <br /> subcontractor's Contract Claims); and <br /> vii. Other categories as specified by the Contractor or the <br /> I City. <br /> 10. A notarized statement shall be submitted to the City's Representative <br /> containing the following language: <br /> Under the penalty of law for perjury or falsification, the undersigned, <br /> I (name) (title) <br /> of <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and <br /> extension of Contract Time, if any, made herein for Work on this <br /> ' Contract is a true and complete statement of the factual basis of the <br /> Contract Claim and all actual costs incurred and time sought, and is <br /> fully documented and supported under the Contract between the <br /> ' parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> My Commission Expires: <br /> 1-09.11(2)C False Or Omitted Information <br /> The Contractor waives each Contract Claim for which it presents material <br /> information that it knows, or in the exercise of reasonable care should know, is <br /> Water Main Replacement"S" Division 1 -GENERAL REQUIREMENTS January 29, 2018 <br /> WO No-UP3664 SP-115 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.