My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 2.02.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> For curb and gutter cement removal with concrete pavement, the curb and gutter will <br /> be considered as pavement removal and the measurement for payment will be to the <br /> back of the curb. <br /> 2-02.5 Payment I <br /> Delete all paragraphs in 2-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover pavement removals, then they shall be included with the <br /> construction of the respective Work including, but not limited to, combined sewer pipe, <br /> water main, water service line, manhole, side sewer pipe, storm drain pipe, catch <br /> basins, and underground utility vaults. <br /> Include curb and gutter and sidewalk removal with construction of the respective Work <br /> including, but not limited to, combined sewer pipe, water main, water service line, <br /> manhole, side sewer pipe, storm drain pipe, catch basins, and underground utility <br /> vaults with no direct compensation made. I <br /> If there is no pay item for pipe abandonment, then it shall be included with the <br /> construction of the respective Work including, but not limited to, sewer or storm drain <br /> pipe, water main, manhole, catch basin or side sewer with no direct compensation <br /> made. 111 <br /> If there is no pay item for existing valve abandonment, then it shall be included with the <br /> construction of other items of Work with no direct compensation made. <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after <br /> completion of utility work. Grading for street reconstruction shall conform to COE <br /> Standard Drawing No. 302, unless otherwise noted on the Plans. Grading for <br /> pavement patching shall conform to COE Standard Drawing No. 326, unless otherwise <br /> noted on the Plans. <br /> 2-03.2 Vacant <br /> Revise 2-03.2 as follows: <br /> 2.03.2 Materials <br /> Materials shall meet the requirements of the following: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> 2-03.3 Construction Requirements <br /> Supplement 2-03.3 by adding the following: <br /> Blasting is not allowed within the City limits of Everett. I <br /> Use suitable excavated material for roadway embankments. Dispose of surplus <br /> excavated material or unsuitable material in accordance with 2-03.3(7). <br /> Water Main Improvement S Division 2—EARTHWORK January 29, 2018 <br /> WO No.—UP3664 SP—132 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.