My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-12.4 Measurement <br /> Delete all paragraphs of 7-12.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-12.5 Payment <br /> Delete all paragraphs of 7-12.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14 HYDRANTS ' <br /> 7-14.1 Description <br /> Supplement 7-14.1 as follows: <br /> 7-14.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-14.2 Materials <br /> Delete the material list in 7-14.2 and substitute the following: <br /> Provide materials meeting the requirements of the following: ' <br /> Hydrants 9-30.5 Special Provisions <br /> 7-14.3 Construction Requirements <br /> 7-14.3(1) Setting Hydrants <br /> Delete the first and second paragraphs in 7-14.3(1) and substitute the following: <br /> Provide fire hydrant assemblies in accordance with City of Everett Standard <br /> Drawing No. 507 and 508. <br /> Revise the first sentence of the fourth paragraph to read as follows: <br /> Paint hydrants in accordance with Part L in COE Standard Drawing No. 507. <br /> Supplement 7-14.3(1) as follows: <br /> Consider a hydrant in service when it is installed in working order in accordance <br /> with the Plans and Specifications. <br /> 7-14.3(2) Hydrant Connections <br /> Delete the first paragraph in 7-14.3(2) and substitute the following: <br /> Provide continuous 6-inch diameter ductile iron pipe from the auxiliary gate valve ' <br /> at the main to the hydrant in accordance with COE Standard Drawing 507. <br /> Provide mechanical joint restraining glands conforming to 9-30.2(6) of these <br /> Special Provisions. I <br /> 7-14.3(2)A Hydrant Restraints <br /> Revise the first paragraph in 7-14.3(2)A to read as follows: <br /> Restrain thrust created in short hydrant laterals of one pipe length or less <br /> using mechanical retainer glands at the auxiliary valve and hydrant fittings as <br /> shown in the COE Standard Drawing No. 507. For longer hydrant leads <br /> requiring two or more pipe lengths, Contractor may use field lock gaskets in ' <br /> lieu of mechanical joint restraint system to restrain the number of pipe joints <br /> between the auxiliary valve and the hydrant. <br /> Water Main Replacement S Division 7—STORM,SEWER,WATER January 29, 2018 <br /> WO No.—UP3664 SP—154 <br />
The URL can be used to link to this page
Your browser does not support the video tag.