My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' <br /> 7-14.3(2)B Valve Auxiliary Gate Valves and Boxes <br /> ' Revise the first paragraph in 7-14.3(2)B to read as follows: <br /> Provide auxiliary gate valves and valve boxes in accordance with Section 7- <br /> 12 and COE Standard Drawing No. 507. <br /> ' 7-14.4 Measurement <br /> Delete all paragraphs of 7-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14.5 Payment <br /> 1 Delete all paragraphs of 7-14.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-15 SERVICE CONNECTIONS <br /> ' 7-15.1 Description <br /> Delete the first paragraph of 7-15.1 and substitute the following: <br /> This Work consists of installing residential and commercial service connections from <br /> the main to the private line for the premises served. Include the meter box and meter <br /> setter for existing non-metered services. Include replacing existing meter boxes and <br /> meter setters as noted on the Plans and as directed by the Engineer. <br /> Work also includes abandoning existing service connection and service connection <br /> pipe in-place. <br /> Supplement 7-15.1 as follows: <br /> 7-15.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-15.2 Materials <br /> Delete first paragraph and material list of 7-15.2 and substitute the following: <br /> Provide materials meeting the requirements of the following sections: <br /> Saddles 9-30.6(1) Special Provisions <br /> Corporation Stops 9-30.6(2) Special Provisions <br /> Service Pipe 9-30.6(3) Special Provisions <br /> ' Service Fittings <br /> 9-30.6(4) Special Provisions <br /> Meter Setters 9 30.6(5) Special Provisions <br /> Meter Boxes 9-30.6(7) Special Provisions <br /> ' Brass Nipples and 9-30.6(8) Special Provisions <br /> Fittings <br /> 7-15.3 Construction Requirements <br /> ' Revise the first paragraph in 7-15.3 to read as follows: <br /> Provide new service connections to new water mains using specified saddles of the <br /> size and type suitable for use with the service pipe being installed. Install new service <br /> ' connection piping from the main to the meter box as shown on the Plans and directed <br /> by the City Inspector. Install service connection piping perpendicular to the main, <br /> unless shown otherwise on the Plans or directed by the City Inspector. <br /> Revise the second paragraph in 7-15.3 to read as follows: <br /> Water Main Replacement S Division 7—STORM,SEWER,WATER January 29, 2018 <br /> WO No.—UP3664 SP—155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.