My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> Provide trench depth adequate to maintain a minimum of 30-inches of cover over the <br /> top of the connecting service pipe. Exercise particular care to ensure that the main is <br /> not damaged by the Work undertaken to install the service. Excavate and backfill for <br /> service connections as specified in Section 7-09; except, use approved boring <br /> methods to install the service pipeline under cement concrete pavement, curbs, and <br /> sidewalks. , <br /> Supplement 7-15.3 by adding the following: <br /> Provide service connections to water mains in accordance with COE Standard <br /> Drawings No. 501 and 502 as applicable. <br /> Field verify actual service connection location, size and material as existing service <br /> information and locations shown on the Plans may not be accurate since this <br /> information is taken from existing records. Match the service size of the existing <br /> service connection with the minimum service size being 3/4-inch. Should the planned <br /> location require moving after verifying actual service connection in field, City Inspector <br /> and the City Utility Department personnel will make final decision as to its relocation. <br /> Replace existing services from the main to the property line, including the meter box <br /> and meter setting if noted on the Plans. <br /> Bore service connection lines, regardless of size, under pavement section, curbs and <br /> sidewalks where soil conditions and other existing buried utilities allow. The City <br /> Inspector will allow open-cut trench installation across pavement section, curbs and <br /> sidewalks only where soil conditions prohibit boring. Open—cut lawn areas and other <br /> non-pavement areas for service installation unless City Inspector directs otherwise. <br /> The City Inspector may, at the Contractor's request, allow tunneling under curb and <br /> sidewalk as long as it appears no structural damage will be done to curb or sidewalk <br /> as a result of the tunneling operations. Regardless of the method used, the Contractor <br /> shall maintain a minimum of 30-inch cover over the service connection line. Where <br /> open cut trench installation is allowed, keep the trench width to 24-inches or less. <br /> At existing metered services noted for removal or replacement on the Plans, salvage ' <br /> existing meter and stockpile on-site at location approved by City Inspector. Notify City <br /> Inspector 24-hours prior to removal to allow City Inspector to document the meter <br /> number and address of meter being removed. Remove and dispose of existing meter <br /> box, meter setter, fittings and service piping. Where existing metered services are not <br /> being replaced, backfill with native soil, compact and restore the surface to match <br /> existing condition. <br /> Abandon in-place existing service connections noted on the Plans by exposing and <br /> closing the corporation stop at the main and plugging the service line near the public <br /> right of way or easement. <br /> 7-15.3(1) Relocate Water Meter and Box <br /> (******) <br /> Where shown on the Plans, or as directed by the City Inspector, salvage the existing <br /> water meter, meter box and the meter setter being relocated. Reinstall salvaged water <br /> meter, meter box and setter and provide new service connection pipe in accordance <br /> with City of Everett Standard Drawing Nos. 501 and 502 and adjust box to finish grade. <br /> Abandon in-place existing service pipe connection by exposing and closing the <br /> corporation stop at the main and plugging the service line at the old meter box location. <br /> 7-15.4 Measurement <br /> Delete first paragraph of 7-15.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Water Main Replacement S Division 7—STORM,SEWER,WATER January 29, 2018 <br /> WO No.—UP3664 SP—156 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.