My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION <br /> r8-01 EROSION CONTROL <br /> 8-01.1 Description <br /> ' Revise the first paragraph in 8-01.1 to read as follows: <br /> This Work consists of furnishing, installing, maintaining, removing and disposing of <br /> high visibility fence, and water pollution and erosion control items in accordance with <br /> ' the Standard Specifications, these Special Provisions, as shown in the Plans, as <br /> shown on COE Standard Drawings, or as designated by the Engineer. <br /> 8-01.3 Construction Requirements <br /> 8-01.3(1) General <br /> Delete the first through eighth paragraphs and substitute the following: <br /> The Contractor shall install a high visibility fence along the site preservation lines <br /> shown in the Plans or as instructed by the Engineer. <br /> Throughout the life of the project, the Contractor shall preserve and protect the <br /> delineated area, acting immediately to repair or restore any fencing damaged or <br /> removed. <br /> Controlling pollution, erosion, runoff, and related damage requires the Contractor <br /> to perform temporary Work items including but not limited to: <br /> 1. Providing ditches, berms, culverts, and other measures to control surface <br /> water. <br /> 2. Building dams, settling basins, energy dissipaters, and other measures, <br /> to control downstream flows. <br /> 3. Controlling underground water found during construction. <br /> 4. Covering or otherwise protecting slopes and stockpiles until permanent <br /> ' erosion-control measures are working. <br /> To the degree possible, the Contractor shall coordinate this temporary Work with <br /> permanent drainage and erosion control Work the Contract requires. <br /> ' All sediment control devices including, but not limited to, sediment ponds, <br /> perimeter silt fencing, or other sediment trapping BMPs shall be installed prior to <br /> any ground disturbing activity. Clearing, grubbing, excavation, borrow, or fill within <br /> ' the Right of Way shall never expose more erodible earth than as listed below: <br /> Western Washington Eastern Washington <br /> (West of the Cascade Mountain (East of the Cascade Mountain <br /> Crest) Crest) <br /> May 1 through 17 Acres April 1 through 17 Acres <br /> September 30 October 31 <br /> October 1 through 5 Acres November 1 through 5 Acres <br /> ' April 30 March 31 <br /> 8-01.3(1)A Submittals <br /> Revise 8-01.3(1)A to read as follows: <br /> The Contractor shall prepare and submit a Temporary Erosion and Sediment <br /> Control (TESC) Plan consisting of a narrative section and plan sheets <br /> meeting the requirements of Chapter 2 of the DCSS. <br /> ' The Contractor may adopt the TESC measures indicated in the Drawings in <br /> preparing the TESC Plan. The Contractor shall complete and modify the <br /> TESC Plan to meet the Contractor's schedule and method of construction. All <br /> ' TESC Plans shall meet the requirements of the current edition of the <br /> Water Replacement"S" Division 8—MISC CONSTRUCTION January 29, 2018 <br /> WO No.—UP3664 SP—159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.