Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION <br /> r8-01 EROSION CONTROL <br /> 8-01.1 Description <br /> ' Revise the first paragraph in 8-01.1 to read as follows: <br /> This Work consists of furnishing, installing, maintaining, removing and disposing of <br /> high visibility fence, and water pollution and erosion control items in accordance with <br /> ' the Standard Specifications, these Special Provisions, as shown in the Plans, as <br /> shown on COE Standard Drawings, or as designated by the Engineer. <br /> 8-01.3 Construction Requirements <br /> 8-01.3(1) General <br /> Delete the first through eighth paragraphs and substitute the following: <br /> The Contractor shall install a high visibility fence along the site preservation lines <br /> shown in the Plans or as instructed by the Engineer. <br /> Throughout the life of the project, the Contractor shall preserve and protect the <br /> delineated area, acting immediately to repair or restore any fencing damaged or <br /> removed. <br /> Controlling pollution, erosion, runoff, and related damage requires the Contractor <br /> to perform temporary Work items including but not limited to: <br /> 1. Providing ditches, berms, culverts, and other measures to control surface <br /> water. <br /> 2. Building dams, settling basins, energy dissipaters, and other measures, <br /> to control downstream flows. <br /> 3. Controlling underground water found during construction. <br /> 4. Covering or otherwise protecting slopes and stockpiles until permanent <br /> ' erosion-control measures are working. <br /> To the degree possible, the Contractor shall coordinate this temporary Work with <br /> permanent drainage and erosion control Work the Contract requires. <br /> ' All sediment control devices including, but not limited to, sediment ponds, <br /> perimeter silt fencing, or other sediment trapping BMPs shall be installed prior to <br /> any ground disturbing activity. Clearing, grubbing, excavation, borrow, or fill within <br /> ' the Right of Way shall never expose more erodible earth than as listed below: <br /> Western Washington Eastern Washington <br /> (West of the Cascade Mountain (East of the Cascade Mountain <br /> Crest) Crest) <br /> May 1 through 17 Acres April 1 through 17 Acres <br /> September 30 October 31 <br /> October 1 through 5 Acres November 1 through 5 Acres <br /> ' April 30 March 31 <br /> 8-01.3(1)A Submittals <br /> Revise 8-01.3(1)A to read as follows: <br /> The Contractor shall prepare and submit a Temporary Erosion and Sediment <br /> Control (TESC) Plan consisting of a narrative section and plan sheets <br /> meeting the requirements of Chapter 2 of the DCSS. <br /> ' The Contractor may adopt the TESC measures indicated in the Drawings in <br /> preparing the TESC Plan. The Contractor shall complete and modify the <br /> TESC Plan to meet the Contractor's schedule and method of construction. All <br /> ' TESC Plans shall meet the requirements of the current edition of the <br /> Water Replacement"S" Division 8—MISC CONSTRUCTION January 29, 2018 <br /> WO No.—UP3664 SP—159 <br />