My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-01.4 Measurement <br /> Delete all paragraphs in 8-01.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 8-01.5 Payment <br /> Delete all paragraphs in 8-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be ' <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 8-02 ROADSIDE RESTORATION , <br /> 8-02.1 Description <br /> Supplement 8-02.1 by adding the following: <br /> All plant materials required by the Contract Documents shall be Plant Selection <br /> Including Plant Establishment (PSIPE) per the Standard Specifications. <br /> 8-02.2 Materials <br /> Supplement 8-02.2 by adding the following to the list of materials: <br /> Topsoil Type A 9-14.1(1) (Special Provisions) <br /> Seed 9-14.2 (Special Provisions) <br /> Bark or Wood Chip Mulch 9-14.4(3) Special Provisions) <br /> Compost 9-14.4(8) <br /> 8-02.3 Construction Requirements <br /> 8-02.3(1) Responsibility During Construction <br /> Supplement 8-02.3(1) by adding the following: <br /> No dumping or stockpiling of topsoil, compost or bark mulch on roadway surfaces ' <br /> will be allowed. <br /> 8-02.3(2) Work Plans <br /> 8-02.3(2)A Roadside Work Plan <br /> Supplement 8-02.3(2)A by adding the following: <br /> Submit to the City a Roadside Work Plan meeting the requirements of the <br /> Standard Specifications a minimum of 30 calendar days prior to commencing <br /> the installation of topsoil, compost, bark mulch or landscape materials. <br /> 8-02.3(5) Planting Area Preparation <br /> Supplement 8-02.3(5) by adding the following: <br /> Amend soil in hydroseed areas and planting areas with four inches of Compost <br /> tilled six inches into the native soil. Lightly compact soil and establish a smooth <br /> and uniform finished grade that protects against obstruction to surface drainage. <br /> 8-02.3(8) Planting <br /> Supplement 8-02.3(8) by adding the following: <br /> Install plants at the same depth grown in nursery; top of rootball should be level <br /> with ground line. Scarify sides of planting pit in order to allow for root penetration, <br /> and recompact the subgrade at the bottom of the planting pit to prevent settling. <br /> Pull bark mulch back from the base of plants. <br /> 8-02.3(11) Bark or Wood Chip Mulch <br /> Supplement 8-02.3(11) by adding the following: <br /> Water Replacement"S" Division 8—MISC CONSTRUCTION January 29, 2018 <br /> WO No.—UP3664 SP—162 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.