My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor may at his option use sod brought in from an outside source in lieu <br /> of replacing existing sod. If the Contractor elects to use sod from an outside <br /> source, the Engineer shall approve the supply source. <br /> The sod shall be removed to a uniform depth of approximately 2-inches with an <br /> approved type of sod cutter. This operation shall be performed in such a manner <br /> as to ensure uniform thickness of sod throughout the operation. <br /> Where sod is to be replaced with new sod, provide new sod in accordance with 9- <br /> 14.6(8) of these Special Provisions and the Standard Specifications. <br /> Guarantee sod to survive in a healthy condition through the 90 day establishment <br /> period. The establishment period shall begin on the date the Engineer accepts <br /> the sod placement. Remove and replace, at Contractor's expense, sod that in the <br /> opinion of the Engineer is not in a healthy growing condition at the end of the , <br /> establishment period. Provide replacement sod that is of the same mixture and <br /> grade as the surviving sod. <br /> Supplement 8-02.3 by adding the following: <br /> 8-02.3(17) Landscape Restoration <br /> Restore all disturbed areas to original condition or better. The Contractor is specifically <br /> reminded that unnecessary damage caused beyond the limits of clearing or <br /> construction shall be repaired in like or better condition at the Contractor's sole <br /> expense. <br /> Restore grass areas with hydroseed where directed. Provide grass seed in accordance <br /> with these Special Provisions. Grass seed and hydroseeding will be incidental to the <br /> lump sum price for Landscape Restoration. <br /> Provide Topsoil Type A in accordance with these Special Provisions incidental to the <br /> lump sum price for Landscape Restoration. <br /> Provide Bark Mulch in accordance with these Special Provisions incidental to the lump <br /> sum price for Landscape Restoration. <br /> 8-02.4 Measurement <br /> Delete all paragraphs in 8-02.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-02.5 Payment ' <br /> Delete all paragraphs in 8-02.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS <br /> 8-04.1 Description <br /> Revise the first paragraph in 8-04.1 to read as follows: <br /> This work shall consist of construction of cement concrete curbs, curbs and gutters, <br /> gutters, and HMA asphalt Curbs in accordance with 8-04 of the Standard <br /> Specifications and as modified in these Special Provisions conforming to the Plans and <br /> COE Standard Drawings. <br /> 8-04.2 Materials <br /> Supplement 8-04.2 by adding the following: <br /> Liquid Membrane-Forming Concrete 9-23.2 Special Provisions ' <br /> Water Replacement"S" Division 8-MISC CONSTRUCTION January 29, 2018 <br /> WO No.-UP3664 SP-164 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.