Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> complete installation along the run of each pipe size, as shown on the Plans and specified <br /> herein, and additionally, shall include, but not be limited to, the following: <br /> 1 1. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, removal and disposal of the existing asphalt <br /> concrete pavement, sidewalk, curb, thrust blocks, miscellaneous landscaping, and sod <br /> 1 as indicated on the Plans. <br /> 2. All required potholing to verify locations of water service crossings and existing utilities. <br /> The costs for pot-holing and excavation required to determine exact depths and <br /> locations of other utilities shall be included with this Work with no direct compensation <br /> made. <br /> 3. Utility or light pole holding in conformance with the requirements of the applicable utility <br /> including, if necessary, arranging for the utility to hold poles and paying the associated <br /> fees. <br /> 4. Trench excavation and dewatering, installation of pipe, furnishing, placing and <br /> compacting sand backfill for pipe bedding, furnishing, placing and compacting suitable <br /> native material for trench backfill and placing and compacting imported backfill <br /> material. No extra payment shall be made for removing, loading, hauling, and <br /> disposing of displaced and unsuitable material. <br /> 5. Maintenance, restoration and/or relocation, if required, of existing culverts, storm <br /> drainage pipe, other utilities and structures affected by construction that are to remain. <br /> 6. Temporary and permanent thrust blocking and dead man blocks, and temporary and <br /> permanent restraint systems. <br /> 7. Ethafoam pads or sand backfill between water main and other pipes. <br /> 8. Maintenance of existing water main and provisions for interim water service. <br /> 9. Pressure and purity testing of all water mains and shall include providing temporary <br /> blow-offs, backflow prevention, air gap apparatus, flushing, and disinfecting as <br /> necessary for testing in accordance with 7-09.3(24) of these Special Provisions and <br /> COE Standard Drawing No. 526. <br /> 10. Extra depth, including excavation, backfill and compaction required to clear known <br /> buried utilities or other known obstacles. <br /> 11. Abandonment of existing water mains as shown on the Plans, including cutting, <br /> draining water and properly disposing, and plugging pipe at each end with a minimum <br /> of 2-feet of Commercial concrete or CDF. Include the concrete or CDF work with this <br /> work with no direct compensation being made. Abandon existing mains in place where <br /> possible. Include cost of removal, hauling, and diaNuaal of existing main with these Bid <br /> items when abandoning in place is not possible. Include closing existing valves, and <br /> plugging where noted, to be abandoned and removing the lids and valve boxes. <br /> 12. Work required to avoid unexpected or unforeseen obstacles shall be paid for under the <br /> Force Account item. <br /> Bid Item 18 - Gate Valve, 8-Inch <br /> Bid Item 19 - Gate Valve, 12-Inch <br /> 1 Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Gate Valves, -Inch shall constitute full compensation for all <br /> labor, materials, tools and equipment necessary and incidental to furnish and install valves <br /> complete in place on the water main, including but not limited to, dewatering; removal and <br /> disposal of existing curb and gutter, and sidewalk; excavation, removal, hauling, and <br /> disposal of excavated materials; furnishing, jointing, and installing valves and valve boxes <br /> with extensions if necessary; installing temporary concrete thrust blocks; restraint systems; <br /> painting; flushing and disinfecting; furnishing, installing, compacting, and testing bedding <br /> Water Main Replacement"S" Division B-BID DESCRIPTIONS January 29, 2018 <br /> WO No.-UP3664 SP-9 <br />