Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Provide standard locations for concrete sidewalk through joints in accordance with <br /> these Special Provisions, in addition to the Plans, at the following: <br /> ' a. At street margins produced and at 30-foot intervals. <br /> b. To separate concrete driveways, stairways, curb ramps and their <br /> landings from sidewalks. <br /> ' c. Around the vertical barrel of fire hydrants, around utility poles and large <br /> diameter underground utility cover castings when located in the sidewalk <br /> area. <br /> ' (i) Provide 18-inch No. 4 rebar placed diagonally and at least 6-inchs <br /> off each corner of through joint noted in (c). <br /> d. Longitudinally between concrete walks, curbs, paved planting strips and <br /> solid masonry or concrete walls where they abut. <br /> e. To match as nearly as possible the through joints in the adjacent <br /> pavement and curb when sidewalk abuts curb. <br /> Construct transverse contraction joints with premolded material 3/8-inch by 1-1/2- <br /> inch wide and set at maximum 15-foot intervals, or as decided by the Engineer. <br /> Provide 3/8-inch thick premolded non-extruding joint material, cut equal to the full <br /> depth of the concrete, plus 1/2-inch transverse and longitudinal through joints as <br /> shown on Standard Plan No. 312. Install with top edge flush with the finished <br /> surface of the concrete, in a perpendicular plane to the surface and with the <br /> bottom edge embedded in the subgrade. Install joints in a straight alignment, <br /> except where placed in curved locations as required by the Plans. <br /> 8-14.3(4) Curing <br /> Maintain sufficient protective covering on—site, such as waterproof paper or plastic <br /> membrane, to cover an entire day's pour in event of rain or other unsuitable weather. <br /> Protect the concrete sidewalk against damage or defacement until Owner has been <br /> accepted the Work. Remove and replace sidewalk that is not acceptable to the <br /> Engineer because of damage or defacement at Contractor's expense. <br /> After finishing, spray cement concrete sidewalk using transparent curing compound in <br /> accordance with 5-05.3(13)A of the Standard Specifications. <br /> 8-14.4 Measurement <br /> Delete all paragraphs in 8-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-14.5 Payment <br /> Delete all paragraphs in 8-14.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-22 PAVEMENT MARKING <br /> ' 8-22.1 Description <br /> Supplement 8-22.1 by adding the following: <br /> Provide 24-inch wide stop line. <br /> Provide 24-inch wide solid white lines for crosswalks in accordance with COE <br /> Standard Drawing No. 721. <br /> i <br /> Water Replacement"S" Division 8—MISC CONSTRUCTION January 29, 2018 <br /> WO No.—UP3664 SP—169 <br />