My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-13.4 Measurement <br /> Delete all paragraphs in 8-13.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-13.5 Payment <br /> Delete all paragraphs in 8-13.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-14 CEMENT CONCRETE SIDEWALKS 1 <br /> 8-14.2 Materials <br /> Supplement 8-14.2 by adding the following: <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions 111 <br /> 8-14.3 Construction Requirements <br /> Supplement 8-14.3 by adding the following: <br /> Provide concrete mix with slump not exceeding 3-1/2 inches. <br /> Add coloring agent for matching the color of newly constructed cement concrete <br /> sidewalks to the color of adjacent existing cement concrete sidewalks. Add to the <br /> concrete during mixing in an amount not to exceed 1-1/2 pounds per cubic yard of <br /> concrete. Do NOT use coloring agent in curb ramps. <br /> 8-14.3(1) Excavation <br /> Supplement 8-14.3(1) by adding the following: <br /> Obtain approval of the Engineer to provide, place and compact Gravel Borrow <br /> meeting the requirements of 9-03.14 of the Standard Specification if there is <br /> insufficient suitable native material on the Project to fill low areas for the sidewalk <br /> subgrade. <br /> 8-14.3(2) Forms <br /> Supplement 8-14.3(2) by adding the following: <br /> Before setting the forms, grade the subgrade to two inches below established <br /> grade to accommodate two inches of crushed surfacing top course. 1 <br /> Install sidewalk drains prior to placing forms if the Plans calls for sidewalk drains <br /> or the Engineer directs installation of sidewalk drains. <br /> 8-14.3(3) Placing and Finishing Concrete <br /> Supplement 8-14.3(3) by adding the following: <br /> Form joints by first cutting a groove in the concrete with a tee bar of a depth equal <br /> to, but not greater than the joint filler material, and then work the premolded joint <br /> filler into the groove. Position premolded joint filler for through and contraction <br /> joints in true alignment at right angles to the line of the sidewalk and be normal to <br /> and flush with the surface. <br /> Edge joints using a 1/4 inch radius edger and tool the sidewalk edges using a 1/2- <br /> inch radius edger. <br /> Obtain Engineer's approval of placing and finishing tools. Perform the concrete <br /> sidewalk placing and finishing under the control of the Engineer. Provide finished <br /> appearance by using an edging tool lightly on the sidewalk edges after the brush <br /> finish. t <br /> Water Replacement"S" Division 8—MISC CONSTRUCTION January 29,2018 <br /> WO No.—UP3664 SP—168 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.