My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> I TABLE OF CONTENTS <br /> IADVERTISEMENT FOR BIDS 1 <br /> DIVISION B - BID ITEM DESCRIPTIONS 3 <br /> I <br /> DIVISION P - PROPOSAL 17 <br /> BID SCHEDULE 19 <br /> I PROPOSAL SIGNATURE SHEET 22 <br /> SUBCONTRACTORS FORM 23 <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 24 <br /> INON-COLLUSION AFFIDAVIT 25 <br /> BID DEPOSIT 26 <br /> BID BOND 26 <br /> IICONTRACT 29 <br /> PAYMENT BOND 33 <br /> I PERFORMANCE BOND 35 <br /> DIVISION 1 — GENERAL REQUIREMENTS 37 <br /> General Description and Location of Project (******) 37 <br /> IDesign Engineer (******) 37 <br /> Standard Specifications (******) 37 <br /> I 1-01 DEFINITIONS AND TERMS 38 <br /> 1-01.3 Definitions 38 <br /> 1-02 BID PROCEDURES AND CONDITIONS 42 <br /> I 1-02.1 Prequalifications of Bidders 42 <br /> 1-02.1 Bidder Responsibility Criteria (******) 42 <br /> 1-02.2 Plans and Specifications 42 <br /> I 1-02.4 Examination of Plans, Specifications, and Site of Work 43 <br /> 1-02.5 Proposal Form 44 <br /> 1-02.6 Preparation of Proposal 44 <br /> I 1-02.7 Bid Deposit 45 <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification 45 <br /> 1-02.9 Delivery of Proposal 46 <br /> I 1-02.10 Withdrawaling, Revising, or Supplementing Proposal 46 <br /> 1-02.12 Public Opening of Proposals 46 <br /> 1-02.13 Irregular Proposals 46 <br /> 1 1-02.14 Disqualification of Bidders 47 <br /> 1-02.15 Pre Award Information 47 <br /> 1-03 AWARD AND EXECUTION OF CONTRACT 47 <br /> 1-03.1 Consideration of Bids 47 <br /> Watermain Replacement"S" Table of Contents- January 29, 2018 <br /> I <br /> WO No.—UP3664 SP-i <br />
The URL can be used to link to this page
Your browser does not support the video tag.