My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-03.2 Award of Contract 48 <br /> 1-03.3 Execution of Contract 49 ' <br /> 1-03.4 Contract Bond 49 <br /> 1-03.5 Failure to Execute Contract 49 <br /> 1-03.6 Return of Bid Deposit 50 <br /> I <br /> 1-03.7 Judicial Review 50 <br /> 1-04 SCOPE OF THE WORK 50 <br /> 1-04.1 Intent of the Contract 50 <br /> I <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and Addenda 51 <br /> 1-04.3 Reference Information 51 <br /> 1-04.4 Changes 52111 <br /> 1-04.4 Changes 52 <br /> 1-04.5 Procedure and Protest by the Contractor 53 <br /> I <br /> 1-04.5 Notice by Contractor (******) 53 <br /> 1-04.6 Variation in Estimated Quantities 55 <br /> 1-04.7 Differing Site Conditions (Changed Conditions) 55 <br /> 1-05 CONTROL OF WORK 56 <br /> 1-05.1 Authority of the Engineer 56 <br /> 1-05.1 City(******) 56 <br /> 1-05.2 Authority of Assistants and Inspectors 56 I <br /> 1-05.2 City's Representative (******) 56 <br /> 1-05.3 Working Drawings 57 I 1-05.4 Conformity With and Deviations From Plans and Stakes 60 <br /> 1-05.6 Inspection of Work and Materials 61 <br /> 1-05.7 Removal of Defective and Unauthorized Work 62 <br /> 1-05.10 Guarantees 63 III <br /> 1-05.11 Final Inspection 64 <br /> 1-05.11 Final Inspections and Operational Testing (******) 64 <br /> I <br /> 1-05i2 Anal Acceptance 65 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 66 <br /> 1-05.14 Cooperation With Other Contractors 66 <br /> I <br /> 1-05.16 Water and Power (******) 67 <br /> 1-05.17 Oral Agreements (******) 67 <br /> 1-05.18 Contractor (******) 67 <br /> I <br /> 1-05.19 City-Contractor Coordination (******) 69 <br /> 1-06 CONTROL OF MATERIAL 71 <br /> 1-06.1 Approval of Materials Prior to Use 71 <br /> 1-06.2 Acceptance of Materials 71 <br /> 1-06.3 Manufacturer's Certificate of Compliance 72 <br /> 1-06.4 Handling and Storing Materials 72 <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 72 <br /> 1-07.1 Laws to be Observed 72 <br /> I <br /> 1-07.2 State Sales Tax 74 <br /> 1-07.5 Environmental Regulations _ 75 <br /> Watermain Replacement"S" Table of Contents - January 29, 2018 <br /> WO No.-UP3664 SP-ii <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.