CITY OF EVERETT SPECIAL PROVISIONS <br /> omissions in the Working Drawings or from responsibility for having complied with the <br /> provisions of this section. <br /> The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br /> The following listed sections of the Standard Specifications and Special Provisions <br /> require Working Drawings that may or may not be applicable to this specific project. <br /> This list is supplied as an aid to the Contractor and is by no means complete. <br /> Submittal requirements may be found in 1-05.3(1) or elsewhere in these Special <br /> 1 Provisions. <br /> DIVISION 2 EARTHWORK <br /> 2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br /> DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> 7-09 Water Mains <br /> 1 7-09.2 Materials-Catalog Cuts or Standard Plans <br /> 7-12 Valves For Water Mains <br /> 7-12.2 Materials-Catalog Cuts or Standard Plans <br /> 7-14 Hydrants <br /> 7-14.2 Materials-Catalog Cuts or Standard Plans <br /> 7-15 Service Connections <br /> 7-15.2 Materials-Catalog Cuts or Standard Plans <br /> DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> 1 8-13 Monument Cases <br /> 8-13.2 Materials-Standard Plans <br /> Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br /> Contractor and approved by the Engineer. Where a Working Drawing is required by <br /> the Specifications, related Work performed prior to completion of the Engineer's review <br /> of the pertinent submission will be the sole expense and responsibility of the <br /> Contractor. <br /> Supplement 1-05.3 by adding the following: <br /> 1-05.3(1) Submittals <br /> (******) <br /> Where required by the Contract Documents, the Contractor shall submit information, <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> general conformance to the design concept and in compliance with the Plans and <br /> Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br /> complying with Contract requirements. The City's approval of a Submittal does not <br /> constitute a waiver of the Contract requirements. The City will not be obligated to <br /> accept or pay for Work performed by the Contractor that may be affected by materials, <br /> Equipment, or methods of work not submitted in a timely manner so that final review <br /> can be accomplished before the affected Work is complete. The City shall not be <br /> responsible for Delays, inefficiencies, or any additional costs or expenses caused in <br /> whole or in part by Contractor's failure to submit required information in sufficient time <br /> for review, comment, and correction. Contractor's failure to submit required <br /> information in sufficient time for review, comment and correction shall be deemed a <br /> waiver of any and all Contract Claims for adjustment of Contract Sum or Contract Time <br /> arising out of, or related to, such a Submittal. Contractor acknowledges and agrees <br /> Water Main Replacement"S" Division 1 -GENERAL REQUIREMENTS January 29, 2018 <br /> WO No-UP3664 SP-59 <br /> I <br />