My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> under 1-07.18(5)A of this section for Commercial General Liability Insurance. The <br /> Contractor shall also provide proof of insurance coverage in compliance with the <br /> statutory requirements of the Merchant Marine Act of 1920 (the "Jones Act"). <br /> 1-07.18(5)E Excess or Umbrella Liability <br /> ' The Contractor shall provide Excess or Umbrella Liability coverage at limits of <br /> $1,000,000 million per occurrence and annual aggregate. This excess or umbrella <br /> liability coverage shall apply, at a minimum, to both the Commercial General and <br /> Auto insurance policy coverage. <br /> This requirement may be satisfied instead through the Contractor's primary <br /> Commercial General and Automobile Liability coverage, or any combination <br /> I thereof. <br /> 1-07.18(5)F Pollution Liability <br /> The Contractor shall provide a Pollution Liability policy, providing coverage for <br /> ' claims involving bodily injury, property damage (including loss of use of tangible <br /> property that has not been physically injured), cleanup costs, remediation, <br /> disposal or other handling of pollutants, including costs and expenses incurred in <br /> the investigation, defense, or settlement of claims arising out of: <br /> Contractor's operations related to this project; <br /> Remediation, abatement, repair, maintenance or other work with lead-based paint <br /> or materials containing asbestos; and <br /> Transportation of hazardous materials away from any site related to this project. <br /> Such Pollution Liability policy shall provide the following minimum coverage: <br /> ' $2,000,000 <br /> 1-07.18(5)G Professionaleachloss Liabilityandannual aggregate <br /> The Contractor, its Subcontractor and its design consultant providing construction <br /> management, value engineering, or other design-related non-construction <br /> professional services shall provide evidence of Professional Liability insurance <br /> covering professional errors and omissions. Such policy shall provide the <br /> following minimum limits: <br /> $2,000,000 per Claim <br /> If the scope of such design-related professional services includes work related to <br /> pollution conditions, the Professional Liability insurance shall include Pollution <br /> Liability coverage. <br /> If insurance is on a claims made form, its retroactive date, and that of all <br /> ' subsequent renewals, shall be no later than the effective date of this Contract. <br /> 1-07.18(5)H Builder's Risk <br /> If the Project includes construction of a structure, the Contractor shall maintain <br /> property insurance under an "All Risk Builder's Risk" form in an amount equal to <br /> the value of the structure in a form acceptable to the City. The structure shall <br /> have All Risk Builder's Risk Insurance inclusive of earthquake and flood subject to <br /> ' customary industry deductibles. <br /> 1-07.20 Patented Devices, Materials, and Processes <br /> Delete the first paragraph of 1-07.20 and substitute the following: <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> Water Main Replacement"S" Division 1 -GENERAL REQUIREMENTS January 29, 2018 <br /> WO No-UP3664 SP-85 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.