My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering 4/24/2018 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2018
>
HDR Engineering 4/24/2018 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 10:33:39 AM
Creation date
4/26/2018 10:33:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering
Approval Date
4/24/2018
Council Approval Date
4/11/2018
End Date
12/31/2018
Department
Public Works
Department Project Manager
Matt Welborn
Subject / Project Title
2017 Utility Connection Charge Study
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$13,200.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> City of Everett <br /> Water, Sewer and Surface Water Connection Charge Study <br /> Amendment 1 - Compensation <br /> Hourly Billing Rates <br /> The following hourly billing rates were used to establish the project fees for this study and will be <br /> used for this amendment. <br /> Individual Project Role Hourly Rate <br /> Shawn Koorn Project Manager $260.00/hour <br /> Tom Gould QA/QC $290.00/hour <br /> Judy Dean Manager—Technical Analysis $190.00/hour <br /> Kevin Lorentzen Model Development/Training $195.00/hour <br /> Josiah Close Technical Analysis $125.00/hour <br /> Others Project Clerical Support $125.00/hour <br /> Should other HDR individuals be required for this project, they will be billed at their standard <br /> hourly billing rate. The above hourly billing rates will be in effect through December 31, 2018. <br /> Project Fees <br /> Given the hourly billing rates and estimated labor hours by amended task, the total fees for the <br /> City's Amendment 1 were developed. Provided below in Table 1 is a summary of the total fees for <br /> Amendment 1 of the City's connection charge study. <br /> Table 1 <br /> Summary of the Total Fees for Amendment 1 of the <br /> Water, Sewer and Surface Water Connection Charge Study <br /> Total <br /> Labor—Amendment 1: <br /> Task 1:Technical Analysis—Updated Connection Charges $6,350 <br /> Task 2: Additional Project Meeting 2,220 <br /> Task 3: Model Training and Support 3,510 <br /> Task 4: Project Administration/Project Management 1,020 <br /> Grand Total Labor—Amendment 1 $13,100 <br /> Expenses: <br /> Total Expenses $100 <br /> Grand Total—Amendment 1 Fees $13.200 <br /> The above fee estimate is based upon the amended scope of services previously presented. A <br /> detailed fee estimate by individual and task is presented at the end of this section. The <br /> Amendment 1 fees will be billed on a time and material basis. <br /> Page B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.